Deadline-based incentive contracts in project management with cost salience

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Coordination and Incentive Contracts in Project Management under Asymmetric Information

We study the problem of the manager of a project consisting of two sub-projects or tasks which are outsourced to different subcontractors. The project manager earns more revenue from the project if it is completed faster, but he cannot observe how hard subcontractors work, only the stochastic duration of their tasks. We derive the optimal linear incentive contracts to offer to the subcontractor...

متن کامل

Revisiting Incentive-Based Contracts

Incentive-based pay is rational, intuitive, and popular. Agency theory tells us that a principal seeking to align its incentives with an agent's should be able to simply pay the agent to achieve the principal's desired results. Indeed, this strategy has long been used across diverse industries-from executive compensation to education, professional sports to public service-but with mixed results...

متن کامل

Incentive Contracts in Delegated Portfolio Management

This paper analyzes optimal non-linear portfolio management contracts. We consider a setting where the investor faces moral hazard with respect to the effort and risk choices of the portfolio manager. The manager’s employment contract promises her: (a) a fixed payment, (b) a proportional asset-based fee, (c) a benchmark-linked fulcrum fee, and (d) a benchmark-linked option-type “bonus” incentiv...

متن کامل

Project Management Contracts with Delayed Payments

In project management, most manufacturers (project managers) offer no delayed payment contracts under which each supplier (contractor) will receive a pre-specified payment when she completes her task. However, some manufacturers impose delayed payment contracts under which each supplier is paid only after all suppliers have completed their tasks. In this paper, we investigate whether or not the...

متن کامل

Directed Deadline Obligations in Agent-Based Business Contracts

There are B2B relationships that presume cooperation in contract enactment. This issue should be taken into account when modeling, for computational handling, contractual commitments through obligations. Deadline obligations have been modeled by considering that reaching the deadline without compliance brings up a violation. When modeling commitments in business contracts, directed obligations ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Fuzzy Optimization and Decision Making

سال: 2019

ISSN: 1568-4539,1573-2908

DOI: 10.1007/s10700-019-09302-y