Dataset for Beam Commissioning of the Vero4DRT System
نویسندگان
چکیده
منابع مشابه
Commissioning Results of the KSTAR Neutral Beam System
The neutral beam injection (NBI) system is designed to provide the ion heating and current drive for the high performance operation and long pulse operation of the Korean Superconducting Tokamak Advanced Research (KSTAR). The KSTAR NBI consists of two beam lines. Each beam line contains three ion sources of which one ion source has been designed to deliver more than 2.5 MW of deuterium neutral ...
متن کاملBeam Characteristics at Low Dose Monitor Unit Settings for Vero4DRT
The stability of delivery of low monitor unit (MU) setting is important especially for step-andshoot intensity-modulated radiotherapy (IMRT), because the nature of the technique is inherent to repeat beam on/off according to the number of the segments. This study evaluates the dose linearity and profile flatness/symmetry under low MU settings for Vero4DRT, a new linear-accelerator based irradia...
متن کاملstudy of cohesive devices in the textbook of english for the students of apsychology by rastegarpour
this study investigates the cohesive devices used in the textbook of english for the students of psychology. the research questions and hypotheses in the present study are based on what frequency and distribution of grammatical and lexical cohesive devices are. then, to answer the questions all grammatical and lexical cohesive devices in reading comprehension passages from 6 units of 21units th...
Initial Results from Beam Commissioning of the Lhc Beam Dump System
Initial commissioning of the LHC beam dump system with beam took place in August and September 2008. The preparation, setting-up and the tests performed are described together with results of the extractions of beam into the dump lines. Analysis of the first detailed aperture measurements of the extraction channels and kicker performance derived from dilution sweep shapes are presented. The per...
متن کاملCommissioning of the Low Energy Beam Transport
The Front End Test Stand (FETS) at the Rutherford Appleton Laboratory is intended to demonstrate the early stages of acceleration (0-3 MeV) and beam chopping required for high power proton accelerators, including proton drivers for pulsed neutron spallation sources and neutrino factories. A Low Energy Beam Transport (LEBT), consisting of three solenoids and four drift sections, is used to trans...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Medical Physics, Clinical Engineering and Radiation Oncology
سال: 2016
ISSN: 2168-5436,2168-5444
DOI: 10.4236/ijmpcero.2016.51007