Data Analytics of Production Cycle Time for Offsite Construction Projects
نویسندگان
چکیده
منابع مشابه
faciliting lexical access for the fluent production of speech
the hypothesis is that recent and frequent exposure to lexical items leads to a more fluent production of speech in terms of rate of speech. to test the hypothesis,a one-way anova experimental design was carried out. 24 sednior students of efl participated in a one-way interview test. data analyses revealed that those who were exposed frequently to the lexical items over a week prior to inter...
15 صفحه اولfacilitating lexical access for the fluent production of speech
the hypothesis is that recent and frequent exposure to lexical items leads to a more fluent production of speech in terms of rate of speech. to test the hypothesis , a one- way anova experimental design was carried out. 24 senior student of efl participated in a one-way interview test. data analyses revealed that those who were exposed frequently to the lexical items over a week prior to inte...
15 صفحه اولTime Prediction Using a Neuro-Fuzzy Model for Projects in the Construction Industry
This paper presents a prediction model based on a new neuro-fuzzy algorithm for estimating time in construction projects. The output of the proposed prediction model, which is employed based on a locally linear neuro-fuzzy (LLNF) model, is useful for assessing a project status at different time horizons. Being trained by a locally linear model tree (LOLIMOT) learning algorithm, the model is int...
متن کاملA Fuzzy TOPSIS Approach for Big Data Analytics Platform Selection
Big data sizes are constantly increasing. Big data analytics is where advanced analytic techniques are applied on big data sets. Analytics based on large data samples reveals and leverages business change. The popularity of big data analytics platforms, which are often available as open-source, has not remained unnoticed by big companies. Google uses MapReduce for PageRank and inverted indexes....
متن کاملOffsite Construction: Strategic Priorities for Shaping the Future Research Agenda
Modern Methods of Construction (MMC), Offsite Manufacturing (OSM), and Offsite Production (OSP) are all umbrella terms cited as being possible panacea solutions for addressing time, quality and cost concerns often associated with ‘traditional’ construction. In this respect, these issues have been on the agenda for a while now, with no viable business process models or solutions [cf. traditional...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Modular and Offsite Construction (MOC) Summit Proceedings
سال: 2019
ISSN: 2562-5438
DOI: 10.29173/mocs73