CSCW Challenges in Large-Scale Technical Projects: A Case Study
نویسندگان
چکیده
منابع مشابه
Constructive Dynamisms of Large-Scale Urban Projects by the Space Political Economy Approach; a Case Study of Mashhad Metropolis
Aims: The development of large-scale construction projects has transformed the shape of cities towards specific objectives and based on economic and political perspectives that dominate policy-making and planning in cities. The purpose of the research was to study and analyze the spatiality of Mashhad construction mega-projects and to explain the constructive forces and dynamisms of these proje...
متن کاملA Fuzzy Decision-Making Methodology for Risk Response Planning in Large-Scale Projects
Risk response planning is one of the main phases in the project risk management and has major impacts on the success of a large-scale project. Since projects are unique, and risks are dynamic through the life of the projects, it is necessary to formulate responses of the important risks. The conventional approaches tend to be less effective in dealing with the impreciseness of risk response p...
متن کاملTechnical Dependency Challenges in Large-Scale Agile Software Development
This qualitative study investigates challenges associated with technical dependencies and their communication. Such challenges frequently occur when agile practices are scaled to large-scale software development. The use of thematic analysis on semi-structured interviews revealed five challenges: planning, task prioritization, knowledge sharing, code quality, and integration. More importantly, ...
متن کاملPractitioner Case Study: Practical Challenges in Portal Implementation Projects
This interview-based case study describes current portal project practices based on a diverse set of projects, including B2B, B2C, B2E, E2E and mobile. Since 2000 portals have increased their functionality, and widespread availability of portal software has encouraged organisations to install and experiment with them. Portals are adding value by drawing applications together, particularly throu...
متن کاملtechnical and legal parameters for determination of river boundary,( case study haraz river)
چکیده با توسعه شهر نشینی و دخل و تصرف غیر مجاز در حریم رودخانه ها خسارات زیادی به رودخانه و محیط زیست اطراف آن وارده می شود. در حال حاضر بر اساس آئین نامه اصلاح شده بستر و حریم رودخانه ها، حریم کمی رودخانه که بلافاصله پس از بستر قرار می گیرد از 1 تا20 متر از منتهی الیه طرفین بستر رودخانه تعیین، که مقدار دقیق آن در هر بازه از رودخانه مشخص نیست. در کشورهای دیگر روشهای متفاوتی من جمله: درصد ریسک...
15 صفحه اولذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: DAIMI Report Series
سال: 1992
ISSN: 2245-9316,0105-8517
DOI: 10.7146/dpb.v21i411.6724