Critical pathways: A road to institutionalizing pain management
نویسندگان
چکیده
منابع مشابه
Procedure-specific pain management: the road to improve postsurgical pain management?
780 April 2013 T benefits of optimal pain management are well recognized. Nevertheless, treatment of postoperative pain continues to be a major challenge and inadequate postoperative pain relief remains disturbingly high.1,2 This is also demonstrated in a large, comprehensive, prospective cohort study from Germany by Gerbershagen et al.3 published in this issue of ANEstHEsioloGy. one of the rea...
متن کاملPeople Management in Institutionalizing Product Lines
1 Currently, the key approach to large-scale software reuse is product line development, an approach built upon the systematic development of building blocks for reuse. While most work on product lines focusses on technical issues, in the end they are built by by people. Winning them for product line development is a key issue in successfully introducing and institutionalizing product line deve...
متن کاملOptimizing pain management to facilitate Enhanced Recovery After Surgery pathways.
PURPOSE The optimal management of postoperative pain using multimodal analgesia is a key component of Enhanced Recovery After Surgery (ERAS). Pain has adverse clinical implications on postoperative recovery, including prolonging the time to recovery milestones and length of hospital stay. Moreover, the ubiquity of opioids in postoperative analgesic regimens results in adverse effects, such as s...
متن کاملSmartphone applications for chronic pain management: a critical appraisal
php and incorporate the Creative Commons Attribution – Non Commercial (unported, v3.0) License (http://creativecommons.org/licenses/by-nc/3.0/). By accessing the work you hereby accept the Terms. Non-commercial uses of the work are permitted without any further permission from Dove Medical Press Limited, provided the work is properly attributed. For permission for commercial use of this work, p...
متن کاملMedicare in interventional pain management: A critical analysis.
Recent years have been quite eventful for interventional pain physicians with numerous changes in the Medicare payment system with a view for the future and what it holds for interventional pain management for 2006 and beyond. On February 8, 2006, President Bush signed the Deficit Reduction Act of 2005, which cuts the federal budget by 39 billion dollars and Medicare and Medicaid by almost 11 b...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Journal of Pain and Symptom Management
سال: 1996
ISSN: 0885-3924
DOI: 10.1016/0885-3924(95)00169-7