Critical Path in Rotator Cuff Tear.

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Massive rotator cuff tear.

Anthony A. Romeo, MD, Department of Orthopaedic Surgery, Rush University Medical Center, Chicago, Illinois. B C A A 72-year-old woman presents with chronic shoulder pain subsequent to a fall that has not responded to conservative treatment. She tells you that she “wants it fixed.” T2-weighted coronal (A) and sagittal (B) and T1-weighted sagittal (C) magnetic resonance images are provided. What ...

متن کامل

Arthroscopic repair of complete tear of rotator cuff

 Abstract  Background: Rotator cuff tear is one of the most common causes of shoulder  complaints in the elderly. Based on the severity and patient's condition, a variety of  methods applies to manage the tear and surgery is an important method, which could  be done by open or arthroscopic technique. The current study aimed to investigate  and report short-term results of arthroscopic repair of...

متن کامل

Rotator Cuff Tear : Arthroscopic Treatment

Arthroscopic treatment of rotator cuff tears has become a routine procedure following a general trend toward using less invasive procedures. Proponents of this technique emphasize the decreased risk of complications such as infection, stiffness, and deltoid avulsions, whereas critics mention the lack of long-term studies, the controversy over the strength of fixation, and the technical challeng...

متن کامل

Rotator Cuff Tear Shape Characterization

This open-access article is published and distributed under the Creative Commons Attribution NonCommercial No Derivatives License (http://creativecommons.org/licenses/by-nc-nd/3.0/), which permits the noncommercial use, distribution, and reproduction of the article in any medium, provided the original author and source are credited. You may not alter, transform, or build upon this article witho...

متن کامل

Rotator Cuff Tear Kinematics: an In-vitro Study of Rotator Cuff Tear and Repair Kinematics

*Shore, BJ; +**Kedgley, AE;*Drosdowech, DS; *King, GJW; *Athwal, GS; **Johnston, JA; *Faber, KJ *Hand and Upper Limb Centre, Department of Orthopaedics, University of Western Ontario. +**Bioengineering Research Laboratory, St. Joseph’s Health Care London, Hand and Upper Limb Centre, 268 Grosvenor Street, London, Ontario, CANADA, N6A 4L6, 519-646-6000, Fax: 519-646-6049 [email protected] INTRODUCT...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Orthopedics & Traumatology

سال: 2001

ISSN: 1349-4333,0037-1033

DOI: 10.5035/nishiseisai.50.1027