Critical path analysis programming method without network diagram

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Critical path analysis in the network with fuzzy activity times

A natural generalization of the criticality notion in a network with fuzzy activity times is given. It consists in direct application of the extension principle of Zadeh to the notion of criticality of a path (an activity, an event) treated as a function of the activities duration times in the network. There are shown some relations between the notion of fuzzy criticality, introduced in the pap...

متن کامل

EquiDistance Diagram: A New Roadmap Method for Path Planning

This paper introduces a novel heuristic nmdmap method for path planning, one that is inspired by the Vomnoi diagmm concept, but easiZy applicable to geneml configurntion spaces. The nmdmap i s formed by connecting the local maxima of a clearance function which is defined using distance finctions. Reaching the roadmap jivm any jive configurntion is achieved by applying the continuous active-set ...

متن کامل

Fuzzy Critical Path Problem for Project Network

The task of finding the crisp critical path has received researcher’s attention over the past two decades which has wide range of applications in planning and scheduling the large projects. In most cases of our life, the data obtained for decision makers are only approximate, which gives rise to fuzzy critical path problem. In this paper, new ranking methods are introduced to identify the fuzzy...

متن کامل

Superlinear Convergence of a Predictor-corrector Method for Semideenite Programming without Shrinking Central Path Neighborhood

An infeasible start predictor-corrector algorithm for semideenite programming is proposed. It is a direct extension of the Mizuno-Todd-Ye predictor-corrector algorithm for linear programming. The algorithm uses the

متن کامل

analysis of power in the network society

اندیشمندان و صاحب نظران علوم اجتماعی بر این باورند که مرحله تازه ای در تاریخ جوامع بشری اغاز شده است. ویژگیهای این جامعه نو را می توان پدیده هایی از جمله اقتصاد اطلاعاتی جهانی ، هندسه متغیر شبکه ای، فرهنگ مجاز واقعی ، توسعه حیرت انگیز فناوری های دیجیتال، خدمات پیوسته و نیز فشردگی زمان و مکان برشمرد. از سوی دیگر قدرت به عنوان موضوع اصلی علم سیاست جایگاه مهمی در روابط انسانی دارد، قدرت و بازتولید...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: MATEC Web of Conferences

سال: 2018

ISSN: 2261-236X

DOI: 10.1051/matecconf/201819201027