Critical path analysis of TCP transactions

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Performance Analysis of Multi-path Tcp Network

MPTCP is proposed by IETF working group, it allows a single TCP stream to be split across multiple paths. It has obvious benefits in performance and reliability. MPTCP has implemented in Linux-based distributions that can be compiled and installed to be used for both real and experimental scenarios. In this article, we provide performance analyses for MPTCP with a laptop connected to WiFi acces...

متن کامل

critical discourse analysis of two political speeches in light of bakhtins dialogism

چکیده گفتگوگری باختین نظریه ای است که به تفاوت ها احترام گذاشته و گفتگو را ارج می نهد. رشته های مختلف علوم انسانی همواره از این نظریه بهره جسته اند. با وجود این تنها مطالعات اندکی در زمینه تجزیه و تحلیل نقادانه کلام به نظریه گفتگوگری پرداخته اند. پنداشت تحقیق حاضر بر آن است که احترام به حقوق دیگران از طریق فراهم آوردن شرایط یکسان برای بیان نظریات مختلف یکی از مهمترین مشترکات تحلیل انتقادی گفتم...

15 صفحه اول

RFC 6013 TCP Cookie Transactions

TCP Cookie Transactions (TCPCT) deter spoofing of connections and prevent resource exhaustion, eliminating Responder (server) state during the initial handshake. The Initiator (client) has sole responsibility for ensuring required delays between connections. The cookie exchange may carry data, limited to inhibit amplification and reflection denial of service attacks. Status of This Memo This do...

متن کامل

T/TCP - TCP Extensions for Transactions Functional Specification

Status of this Memo This memo describes an Experimental Protocol for the Internet community, and requests discussion and suggestions for improvements. It does not specify an Internet Standard. Distribution is unlimited. Abstract This memo specifies T/TCP, an experimental TCP extension for efficient transaction-oriented (request/response) service. This backwards-compatible extension could fill t...

متن کامل

Parallel performance evaluation through critical path analysis

In this paper we discuss the concept of space-time diagrams as a representation of the execution of an application, and then give a method, based on critical path analysis, for calculating nontrivial upper bounds on the potential parallelism, known as the average parallelism, a complement to the speedup and efficiency.

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE/ACM Transactions on Networking

سال: 2001

ISSN: 1063-6692

DOI: 10.1109/90.929848