منابع مشابه
Combined Open and Closed Kinetic Chain Exercises for Patellofemoral
Patellofemoral pain syndrome (PFPS) is a common ailment of the knee. Both open and closed kinetic chain exercises are effective in strengthening of the quadriceps muscle. It has been suggested that these exercises are used jointly in the management of PFPS, but no study to date has evaluated the effect of combined open and closed kinetic chain exercises on PFPS. The present randomized controlle...
متن کاملExplosive Exercises in Sports Training: a Critical Review
Bruce-Low S, Smith D. Explosive Exercises In Sports Training: A critical Review. JEPonline 2007;10(1):21-33. This paper reviews evidence relating to the effectiveness and safety of explosive exercises, such as Olympic style weight lifting, other weight training exercises performed at a fast cadence, and plyometric exercises, that are commonly used in the strength and conditioning training of at...
متن کاملThe Effects of Closed Kinetic Chain Exercises and Open Kinetic Chain Exercises Using Elastic Bands on Electromyographic Activity in Degenerative Gonarthritis
[Purpose] The purpose of this study was to examine the effects of closed kinetic chain exercises (CKCEs) and open kinetic chain exercises (OKCEs) with elastic bands on the electromyographic activity of patients with degenerative gonarthritis. [Subjects] The study subjects were 30 degenerative gonarthritis patients who were divided into a CKCE group (CKCEG, n=10), an OKCE group (OKCEG, n=10), an...
متن کاملResource Allocation Optimization in Critical Chain Method
The paper presents resource allocation optimization in Critical Chain Project Management (CCPM). The cheapest project schedule is searched with respect to time constraints. The algorithm originally developed for the hardware-software co-design of heterogeneous distributed systems is adapted to work with human resources and CCPM method. The results of the optimization showed significant efficien...
متن کاملCritical Chain Project Management Theory and Practice
It is now over 10 years since the first publication on Critical Chain Project Management (CCPM) (Goldratt, 1997). Since then, software and implementation practice have developed rapidly. The logic and assumptions underpinning this new knowledge has recently been published (Goldratt, 2007) in the form of a strategy and tactics (S&T) tree. It is, therefore, timely to review the CCPM claims from b...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: American Journal of Business Education (AJBE)
سال: 2010
ISSN: 1942-2512,1942-2504
DOI: 10.19030/ajbe.v3i4.412