CRISTA: A New Paradigm for Low-Power, Variation-Tolerant, and Adaptive Circuit Synthesis Using Critical Path Isolation

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A new circuit model for the Parameters in equations of low power Hodgkin-Huxley neuron cell

In this paper, α and β parameters and gating variables equations of Hodgkin-Huxley neuron cell have been studied. Gating variables show opening and closing rate of ion flow of calcium and potassium in neuron cell. Variable functions α and β, are exponential functions in terms of u potential that have been obtained by Hodgkin and Huxley experimentally to adjust the equations of neural cells. In ...

متن کامل

preparation and characterization of new co-fe and fe-mn nano catalysts using resol phenolic resin and response surface methodology study for fischer-tropsch synthesis

کاتالیزورهای co-fe-resol/sio2و fe-mn-resol/sio2 با استفاده از روش ساده و ارزان قیمت همرسوبی تهیه شدند. از رزین پلیمری resol در فرآیند تهیه کاتالیزور استفاده شد.

A New Ultra Low-Power and Noise Tolerant Circuit Technique for CMOS Domino Logic

Dynamic logic style is used in high performance circuit design because of its fast speed and less transistors requirement as compared to CMOS logic style. But it is not widely accepted for all types of circuit implementations due to its less noise tolerance and charge sharing problems. A small noise at the input of the dynamic logic can change the desired output. Domino logic uses one static CM...

متن کامل

A Variation Tolerant Circuit Design Approach using Parallel Gates

In recent times, VLSI design has become increasingly difficult due to the increasing magnitude of processing variations. This has led to significant problems in terms of reliability, circuit resilience and manufacturing yields. As devices are scaled below 50nm, the random component of the total variations has become significantly more problematic than the systematic component. Random variations...

متن کامل

Synthesis of Low Power Sequential Circuit

Low power design is most required now a days due to scaling down the technology where minimizing the voltage level is the most effective way to minimize the power consumption. This paper presents a double pulse flip flop implemented using 0.18 μm technology. The proposed flip flop avoids unnecessary switching and stacking of transistors and thus consume less power as compared to conventional fl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Transactions on Computer-Aided Design of Integrated Circuits and Systems

سال: 2007

ISSN: 0278-0070

DOI: 10.1109/tcad.2007.896305