COVID-19 pandemic impact: an identification of the cause of cost overrun in construction project

نویسندگان

چکیده

The paper provides a thorough examination of the impact COVID-19 on increasing cost construction project. pandemic had disrupted financial and operational industry. Many projects have been closed suspended, this situation has caused great uncertainty in Even though Instruction Minister Public Work No. 2/2020 issued March 27, 2020, stated that activities Indonesia could continue work. However, it still believes can lead to poor project performance. study used literature review explore factors contributing increase cost. A case hotel is test factors. research found six frequency occurrence for each cause overrun, namely labor, material, implementation time, aspects, estimated cost, occupational health safety. study’s two are not overrun based interviewee’s answer: heavy equipment overhead. This also explains mechanism address

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

the impact of e-readiness on ec success in public sector in iran the impact of e-readiness on ec success in public sector in iran

acknowledge the importance of e-commerce to their countries and to survival of their businesses and in creating and encouraging an atmosphere for the wide adoption and success of e-commerce in the long term. the investment for implementing e-commerce in the public sector is one of the areas which is focused in government‘s action plan for cross-disciplinary it development and e-readiness in go...

the impact of musical texts on the text recall of young learners of english in isfahan junior high schools

abstract although music possesses some kind of power and using it has been welcome by many students in language classrooms, it seems that they take a non-serious image of the lesson while listening to songs and they may think that it is a matter of fun. the main objective of the present study was to investigate whether learning a foreign language through musical texts (songs) can have an impac...

15 صفحه اول

Impact of the COVID-19 Pandemic on Quality of Life for Nurses in Iraq

Background: The COVID-19 pandemic major effect on society people and lead to death of some people. The nurses care staff have been saving lives despite facing the workload and infection risk. Nurses have longer working hours and greater interaction with patients during COVID-19, which can quickly lead to change in quality of life Objective: The study was to assess the impact of the pandemic on...

متن کامل

The Impact of COVID-19 Pandemic on the Realization of the Right to a Healthy Environment

In December 2019, some people in China were diagnosed with pneumonia which was found in the first studies to be related to the animal and food market in Wuhan, China. The newly identified virus which was named "Coronavirus 2019” spread all around the world, influencing different economic, political, and cultural fields. Since one of the most important sectors affected by the virus was the envir...

متن کامل

The role of data science in encountering COVID-19 pandemic

The COVID-19 pandemic started in China and quickly spread throughout the world. This pandemic has affected the health of millions of people, the global economy and has challenged the majority of scientists and politicians to find effective medical treatments and intelligent policies to reduce the side effects of this pandemic as soon as possible. Technological advancements have enabled us to co...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: E3S web of conferences

سال: 2021

ISSN: ['2555-0403', '2267-1242']

DOI: https://doi.org/10.1051/e3sconf/202133101014