Coupled-beam and coupled-bunch instabilities

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Feedback Control of Coupled - Bunch Instabilities *

May 1993 (4 Feedback Control of Coupled-Bunch Instabilities* J. D. Fox, N. Eisen, H. Hindi, I. Linscott, G. Oxoby, and L. Sapozhnikov Stanford Linear Accelerator Center, Stanford University, Stanford, CA 94309 USA and M. Serio, INFN Laboratori Nazionali, Frascati, Italy The next generation of synchrotron light sources and .particle accelerators will require active feedback systems to control mu...

متن کامل

New Diagnostics and Cures for Coupled-bunch Instabilities

As circular accelerators move towards larger numbers of bunches and higher beam currents, the task of diagnosing and curing coupled-bunch instabilities becomes ever harder. This paper describes the use of phase space tracking, i.e. reconstruction of bunch phase space trajectories, as a comprehensive instability diagnostic. A new instability cure is also presented, based on recent insights into ...

متن کامل

Calculation of Coupled-bunch Instabilities in a Tau-charm Factory

An essential consideration in the design of “tau-charm factory” storage rings is the control of coupled-bunch instabilities. In this paper, examples of calculations of the growth times of these instabilities are presented. With careful attention to the I”,c~i~t! of the RF and feedback systems, it should be feasible to control these instabilities and achieve the desired luminosity. * Work suppor...

متن کامل

Analysis of Coupled Bunch Instabilities in Bessy-vsr

BESSY-VSR, a scheme where 1.5 ps and 15 ps long bunches (rms) can be stored simultaneously in the BESSY II storage ring has recently been proposed [1]. The strong longitudinal bunch focusing is achieved by superconducting high gradient RF cavities. This paper presents investigations of coupled bunch instabilities driven by HOMs of superconducting multi-cell cavities in BESSY-VSR. Analytical cal...

متن کامل

New Simulations of Positron-beam Electron Cloud Build- up and Electron-beam Coupled-bunch Instabilities for Kekb and Super-kekb

I summarize recent electron-cloud and coupled-bunch instability simulation studies for KEKB and SuperKEKB. The possible suppression of the electron-cloud build up inside quadrupole magnets by means of 4 permanent dipoles or by a super-imposed solenoid is investigated for the LER positron beam. Also studied is the electron accumulation in three different types of solenoidal fields, namely for a ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Physical Review Accelerators and Beams

سال: 2018

ISSN: 2469-9888

DOI: 10.1103/physrevaccelbeams.21.114401