منابع مشابه
A Model for Sharing the Costs of Uncontrollable Risks among Contracting Parties
The allocation of risks among the contracting parties in a contract is an important decision affecting the project success. Some risks in a project are uncontrollable; these are imposed to a project by external factors. Since contracting parties can neither control nor affect the occurrence of such risks, their allocation to a party would be inequitable. Therefore the cost overrun related to un...
متن کاملCommunication and Third Parties: Costs, Cues, and Confidentiality
Communication and Third Parties: Costs, Cues, and Confidentiality by Krishnan Eswaran Doctor of Philosophy in Engineering—Electrical Engineering and Computer Sciences and the Designated Emphasis in Communication, Computation, and Statistics University of California, Berkeley Professor Michael Gastpar, Chair This thesis tells the story of Alice and Bob, who wish to share information. However, Al...
متن کاملUnassisted Quantitative Evaluation Of Despeckling Filters
SAR (Synthetic Aperture Radar) imaging plays a central role in Remote Sensing due to, among other important features, its ability to provide high-resolution, day-and-night and almost weather-independent images. SAR images are affected from a granular contamination, speckle, that can be described by a multiplicative model. Many despeckling techniques have been proposed in the literature, as well...
متن کاملUnassisted assessment of stroke severity using telemedicine.
BACKGROUND AND PURPOSE Quantification of stroke severity through telemedicine consultation is challenging and relies on professional support at the patient's bedside. We aimed to develop a novel scale for assessing stroke severity through telemedicine without assistance from a third party (Unassisted TeleStroke Scale [UTSS]). METHODS Stroke severity was assessed in 45 patients with suspicion ...
متن کاملExternal Costs to Parties Involved in Highway Traffic Accidents: The Perspective of Highway Users
This study explores highway travellers’ willingness to pay (WTP) for external costs caused by traffic accidents. There are a number of further external costs, the paper focuses on two externalities: air pollution and time delays. Data collection was performed using the face-to-face survey method, and the surveys were carried out at highway rest areas. Air pollution and time delays were divided ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: The Modern Law Review
سال: 1969
ISSN: 0026-7961
DOI: 10.1111/j.1468-2230.1969.tb02302.x