Cost Management of Mechanical and Electrical Engineering Project Based on Bim Technology

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

An Analytic Model for Organization Readiness of Engineering Project Management Based on Virtual Teams

 The Organization Readiness of Engineering Project Management Based on Virtual Teams has been analyzed in an Iranian Engineering firm. Adapting and analyzing the latest readiness model, experts’ opinions were received by questionnaires and main criteria of the readiness have been identified. The considered readiness criteria are: Infrastructure, Deliverables (Drawings, Reports, Minutes of Meeti...

متن کامل

Information Technology for Project Cost Management (Case study: Soufian Cement Co, Iran)

In today's competitive world, reduction of production costs has become one of the corporates priorities. Survival triangle (cost, quality and time) is the solution that helps companies focus on these three dimensions and have the ability to compete with other companies. Cost management is the first step in this way that providing solutions and advice to managers who need help to have a precise ...

متن کامل

Project Managers Competencies based on ICB and Project Management Processes based on PMBOK in Project Based Organization (Case study: Hydropower Plants Management)

Effective implementation of managerial systems needs software and hardware requirements. Project management competencies of the managers is one of the most important and inevitable requirements to ensure the success of the projects in any industry. Inorder to clarify the requirements, many international and professional instituts have presented well-known frameworks to help the managers to shap...

متن کامل

Flexible resource management and its effect on project cost and duration

In practice, most projects result in cost overruns and schedule slippage due to poor resource management. This paper presents an approach that aims at reducing project duration and costs by empowering project managers to assess different scenarios. The proposed approach addresses combinatorial modes for tasks, multi-skilled resources, and multiple calendars for resources. A case study reported ...

متن کامل

A New Uncertain Modeling of Production Project Time and Cost Based on Atanassov Fuzzy Sets

  Uncertainty plays a major role in any project evaluation and management process. One of the trickiest parts of any production project work is its cost and time forecasting. Since in the initial phases of production projects uncertainty is at its highest level, a reliable method of project scheduling and cash flow generation is vital to help the managers reach successful implementation of the ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Smart Construction Research

سال: 2018

ISSN: 2529-7740

DOI: 10.18063/scr.v2i4.626