Cost Estimation in Engineer-to-Order Manufacturing

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Business Strategy Driven IT Systems For Engineer-To-Order and Make-To-Order Manufacturing Enterprises

This thesis reports research into the specification and implementation of an Information Technology (IT) Route Map. The purpose of the Route Map is to enable rapid design and deployment of IT solutions capable of semi-automating business processes in a manufacturing enterprise. The Map helps structure transition processes involved in “identification of key business strategies and design of busi...

متن کامل

Supply chain management: A strategic issue in engineer to order manufacturing

The characteristics of Engineer to Order (ETO) companies are described in terms of their markets, products and the internal processes of their organisation. These are set in the context of current trends in supply chain management. The business processes associated with the procurement and marketing functions and the interactions with other processes are analysed. These are compared for a numbe...

متن کامل

From Engineer-To-Order to Mass Customization

Purpose Most mass customization literature focuses on the move from mass production to mass customization. However, in some literature Engineer-To-Order (ETO) companies are also claimed to have become mass customizers, although it can be questioned if these companies conform to popular definitions of mass customizers. This raises the question: Under which conditions is it reasonable to label ET...

متن کامل

Planning Complex Engineer-to-order Products

The design and manufacture of complex Engineer-to-Order products is characterised by uncertain operation durations, finite capacity resources and multilevel product structures. Two scheduling methods are presented to minimise expected costs for multiple products across multiple finite capacity resources. The first sub-optimises the operations sequence, using mean operation durations, then refin...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Open Engineering

سال: 2016

ISSN: 2391-5439

DOI: 10.1515/eng-2016-0002