Correction [to “Risk of dam failure in benefit-cost analysis”]

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

The realities of risk-cost-benefit analysis.

Formal analyses can be valuable aids to decision-making if their limits are understood. Those limits arise from the two forms of subjectivity found in all analyses: ethical judgments, made when setting the terms of an analysis, and scientific judgments, made when conducting it. As formal analysis has assumed a larger role in policy decisions, awareness of those judgments has grown, as have meth...

متن کامل

Cost- Benefit Analysis of Gas to Liquids Project for the South-Pars Gas Field of Iran

This paper presents an economic evaluation of gas to liquids (GTL) project using “South-Pars” gas field of Iran based on the latest actual performing GTL projects. Iran has the world’s largest reserves of natural gas and can satisfy the projected long-term market demand of GTL products which have lower pollution and higher quality than refinery products. The results of cost-benefit analysis sho...

متن کامل

Adding thymoglobuline to the conventional immunosuppressant regimen in kidney transplantation: A cost-benefit analysis

Background: Thymoglobuline (TG), is used for both induction and rejection therapy in kidney transplantation (TX). This study was conducted to compare between adding TG or not to the conventional drugs to evaluate the rate of rejections, infections and costs. Methods: In two groups of patients, each of 45 cases group A received conventional drugs (cyclosporine, mycophenolate and prednisolone) a...

متن کامل

Optimal Design and Benefit/Cost Analysis of Reservoir Dams by Genetic Algorithms Case Study: Sonateh Dam, Kordistan Province, Iran

This paper presents a method concerning the integration of the benefit/cost analysis and the real genetic algorithm with various elements of reservoir dam design. The version 4.0 of HEC-RAS software and Hydro-Rout models have been used to simulate the region and flood routing in the reservoir of the dam, respectively. A mathematical programming has been prepared in MATLAB software and linked wi...

متن کامل

Environmental Constraints on Hydropower: An Ex Post Benefit-Cost Analysis of Dam Relicensing in Michigan

We conduct a benefit-cost analysis of a relicensing agreement for two hydroelectric dams in Michigan. The agreement changed daily conditions from peaking to run-of-river flows. We consider three categories of costs and benefits: producer costs of adapting electricity production to the new time profile of hydroelectric output; benefits of reductions in air pollution and greenhouse gas emissions;...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Water Resources Research

سال: 1981

ISSN: 0043-1397

DOI: 10.1029/wr017i002p00447