Correction to: Developing an XGBoost model to predict blast-induced peak particle velocity in an open-pit mine: a case study

نویسندگان

چکیده

In the original version of paper https://doi.org/10.1007/s11600-019-00268-4 .

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A Hybrid Fuzzy MCDM Approach to Determine an Optimal Block Size in Open-Pit Mine Modeling: a Case Study

The computer-based 3D modeling of ore bodies is one of the most important steps in the resource estimation, grade determination, and production scheduling of open-pit mines. In the modeling phase, the volume of the orebody model is required to be filled by the blocks and sub-blocks. The determination of Block Size (BS) is important due to the dependence of the geostatistical issues and calculat...

متن کامل

Studying Peak Particle Velocity Due to Blast in Development Tunnels’ Face in Coal Stoping

The impact of blast-driven shocks on the safety and stability of the underground coal mines has been well established. The seismic imperfections resulting from blasting depend on the total explosive energy released during blasting and the closeness of the development tunnel face to the stope face. Also, the quality of the rock mass wherein the whole stope face is located might pose considerable...

متن کامل

An Approach to Locate an in Pit Crusher in Open Pit Mines

Transportation costs are a significant part of capital and operating costs of large open pit mines. Cost efficiency and high reliability of in pit crushing and conveying systems compared to conventional truck-shovel system makes it more appealing to be utilized in modern mining activities. In this paper the suitable location of an in pit crusher is investigated as a single hub location problem....

متن کامل

An Uncertainty-based Transition from Open Pit to Underground Mining

There are some large scale orebodies that extend from surface to the extreme depths of the ground. Such orebodies should be extracted by a combination of surface and underground mining methods. Economically, it is highly important to know the limit of upper and lower mining activities. This concern leads the mine designers to the transition problem, which is one of the most complicated problems...

متن کامل

Application of artificial neural network and genetic algorithm to modelling the groundwater inflow to an advancing open pit mine

In this study, a hybrid intelligent model has been designed to predict groundwater inflow to a mine pit during its advance. Novel hybrid method coupling artificial neural network (ANN) with genetic algorithm (GA) called ANN-GA, was utilised. Ratios of pit depth to aquifer thickness, pit bottom radius to its top radius, inverse of pit advance time and the hydraulic head (HH) in the observation w...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Acta Geophysica

سال: 2021

ISSN: ['1895-7455', '1895-6572']

DOI: https://doi.org/10.1007/s11600-021-00575-9