Coordinated Production and Delivery Operations With Parallel Machines and Multiple Vehicles
نویسندگان
چکیده
منابع مشابه
A fixed and flexible maintenance operations planning optimization in a parallel batch machines manufacturing system
Scheduling has become an attractive area for artificial intelligence researchers. On other hand, in today's real-world manufacturing systems, the importance of an efficient maintenance schedule program cannot be ignored because it plays an important role in the success of manufacturing facilities. A maintenance program may be considered as the heath care of manufacturing machines and equipments...
متن کاملFinite Horizon Economic Lot and Delivery Scheduling Problem: Flexible Flow Lines with Unrelated Parallel Machines and Sequence Dependent Setups
This paper considers the economic lot and delivery scheduling problem in a two-echelon supply chains, where a single supplier produces multiple components on a flexible flow line (FFL) and delivers them directly to an assembly facility (AF). The objective is to determine a cyclic schedule that minimizes the sum of transportation, setup and inventory holding costs per unit time without shortage....
متن کاملthe past hospitalization and its association with suicide attempts and ideation in patients with mdd and comparison with bmd (depressed type) group
چکیده ندارد.
a fixed and flexible maintenance operations planning optimization in a parallel batch machines manufacturing system
scheduling has become an attractive area for artificial intelligence researchers. on other hand, in today's real-world manufacturing systems, the importance of an efficient maintenance schedule program cannot be ignored because it plays an important role in the success of manufacturing facilities. a maintenance program may be considered as the heath care of manufacturing machines and equip...
متن کاملMulti-Objective Unrelated Parallel Machines Scheduling with Sequence-Dependent Setup Times and Precedence Constraints
This paper presents a novel, multi-objective model of a parallel machines scheduling problem that minimizes the number of tardy jobs and total completion time of all jobs. In this model, machines are considered as unrelated parallel units with different speeds. In addition, there is some precedence, relating the jobs with non-identical due dates and their ready times. Sequence-dependent setup t...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Access
سال: 2020
ISSN: 2169-3536
DOI: 10.1109/access.2019.2958742