Controlling capture plants to avoid CO2 emissions penalties during peak load demand

نویسندگان

چکیده

With the introduction of more and renewables into electricity system, pressure is mounting on thermal power plants to operate in flexible ways. In order capture maximum emissions at lowest cost, integrated with has follow operational regimes parent plant. Therefore, be enough deal load variations meat grid demands. A test campaign been carried out PACT 1tpd CO2 pilot plant investigate flexibility relation variations. Monoethanolamine (40 wt.%) solvent was used from gas turbine representative flue gases containing around 5% CO2. Pressurised Hot Water (PHW) regenerate reboiler. Four Capture scenarios i.e. start-up, minimum stable generation, no-stripping over-stripping, are investigated. No-stripping tests were performed mimic unavailability steam for stripping over varied periods time by stopping PHW flow The results indicate that Specific Reboiler Duty (SRD) increased 8.7 % when stoppage 30 min.. Longer time, longer it takes recover original steady state higher difference between efficiency average period. For over-stripping tests, stripper reduced 0.4 barg value 0.5 a period followed no-stripping. It observed period, recovery time. indicates SRD 36 an hour. conclusion, possible maintain 90 overall efficiency, if over-stripped long but reboiler duty will increased. Optimisation process under these would required achieve commercially-optimised balance increase costs while achieving also minimises emission costs.

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Comparing post-combustion CO2 capture operation at retrofitted coal-fired power plants in the Texas and Great Britain electric grids

This work analyses the carbon dioxide (CO2) capture system operation within the Electric Reliability Council of Texas (ERCOT) and Great Britain (GB) electric grids using a previously developed first-order hourly electricity dispatch and pricing model. The grids are compared in their 2006 configuration with the addition of coal-based CO2 capture retrofits and emissions penalties from 0 to 100 US...

متن کامل

Controlling Peak Power During Scan Testing

This paper presents a procedure for modifying a given set of scan vectors so that the peak power during scan testing is kept below a specified limit without reducing fault coverage. The proposed approach works for any conventional full-scan design -no extra design-for-test (DFT) logic is required. If the peak power in a clock cycle during scan testing exceeds a specified limit (which depends on...

متن کامل

A Primary Market for Optimizing Power Peak-Load Demand Limits

For the purpose of aiding upper-level strategic or political decision making and some forms of conflict management, this chapter revisits the concept of dialectical inquiry (DI) from the perspective of collaborative framing or modeling for “collaboration engineering.” It does so by integrating the recent literature with its theoretical and philosophical sources. The connection of DI and the pro...

متن کامل

Control of a post-combustion CO2 capture plant during process start-up and load variations

Dynamic and flexible operation of a carbon capture plant is important as thermal power plants must be operated very flexibly to accommodate large shares of intermittent energy sources such as wind and solar energy. To facilitate such operation, dynamic models for simulation, optimization and control system design are crucial. In this paper, we present a dynamic mathematical model for the absorp...

متن کامل

Environomic optimal design of power plants with CO2 capture

Life cycle impact assessment indicators are integrated for studying the process integration of renewable resources and CO2 capture and storage (CCS) in power plants. Besides the expected reduction in global warming potential (GWP), CCS induces energy and cost penalties. This paper presents a systematicmultiobjective optimisation framework for the optimal design of power plants with CO2 capture ...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: International Journal of Greenhouse Gas Control

سال: 2021

ISSN: ['1750-5836', '1878-0148']

DOI: https://doi.org/10.1016/j.ijggc.2021.103285