Control of construction projects using the Earned Value Method - case study
نویسندگان
چکیده
منابع مشابه
a study on construction of iranian life tables: the case study of modified brass logit system
چکیده ندارد.
15 صفحه اولThe Cost Monitoring of Construction Projects Through Earned Value Analysis
In construction industry, the term ‘procurement’ is considered as a project based job where clients and contractors are always keen to observe performance indicators. These indicators represent financial and non-financial efficiency of project activities. Among these, the monitoring of financial indicators is an important function of project management. Therefore, during the construction phase,...
متن کاملValue-based Software Engineering: a Case Study Using Earned Value
plex project. But it has absolutely nothing to say about the stakeholder value of the system the project is developing. It serves a purpose, but needs to be incorporated into feedback control systems that focus on the real stakeholder value being earned. The value-based software engineering agenda, described in the “Accounting for Value in Software Engineering” sidebar, seeks to integrate value...
متن کاملbuckling of viscoelastic composite plates using the finite strip method
در سال های اخیر، تقاضای استفاده از تئوری خطی ویسکوالاستیسیته بیشتر شده است. با افزایش استفاده از کامپوزیت های پیشرفته در صنایع هوایی و همچنین استفاده روزافزون از مواد پلیمری، اهمیت روش های دقیق طراحی و تحلیل چنین ساختارهایی بیشتر شده است. این مواد جدید از خودشان رفتارهای مکانیکی ارائه می دهند که با تئوری های الاستیسیته و ویسکوزیته، نمی توان آن ها را توصیف کرد. این مواد، خواص ویسکوالاستیک دارند....
Investigating the Impact of Safety Investment on Safety Culture in Construction Projects - Case Study of Power Plant Construction Projects
Background and aims: Construction industry is known as one of the most perilous industries in that it is involving the hazardous projects as well as the high manpower activities correlating with a high rate of work-related accidents. On the other hand, the high rate of accidents in the industry demanding a big budget for the damages; therefore, safety is strongly emphasized in the construction ...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Open Engineering
سال: 2019
ISSN: 2391-5439
DOI: 10.1515/eng-2019-0020