Contractual Efficiency of PPP Infrastructure Projects: An Incomplete Contract Model

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Contract Incompleteness , Contractual Enforcement and Bureaucracies ∗

This paper explains frequently observed coexistence of deficient property rights and heavy bureaucracies. We suggest that there is a specific role for bureaucracies in environments with insure property rights. In such situations, bureaucracies substitute for enforceable contracts. We study irreversible investment in an asset over which property rights are unclear, and model the property rights ...

متن کامل

Privatization and Restructuring: An Incomplete – Contract Approach

This paper deals with a special hold-up problem in privatization. Since the enterprise, which is to be privatized, has to be restructured in a situation of uncertainty and the restructuring investments are sunk when the final decision on the sale price is taken in renegotiations, there is an imminent danger that restructuring is not done on an efficient scale, and there is underinvestment. We c...

متن کامل

Structuring Equity Investment in Ppp Projects

Earlier studies have established guidelines to optimize the capital structure of a privatized project. However, in the US, many Public-Private Partnership (PPP) projects may not be fully self-financed through toll or other operating revenues due to insufficient revenue streams. With the limited debt capacity secured by toll revenues, most PPP projects must be backed by both private equity inves...

متن کامل

Contractual Performance, Corrective Justice, and Disgorgement for Breach of Contract

This paper is about the remedy of disgorgement for breach of contract. In it I argue for two conclusions. I first argue that, prima facie at least, disgorgement damages for breach of contract present something of a puzzle. But second, I argue that if we pay close attention to the notion of contractual performance, this puzzle can be resolved in a way that is consistent with principles of correc...

متن کامل

Debt Renegotiation With Incomplete Contract

A debt contract usually does not include a provision about renegotiation. The right to seize the borrower’s asset and the rules of this process are usually stipulated in the contract. Such a promise not to renegotiate is not credible since renegotiation can mitigate the dead-weight loss of liquidating insolvent borrowers. Once the initial contract may not consider the renegotiation procedure an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Mathematical Problems in Engineering

سال: 2018

ISSN: 1024-123X,1563-5147

DOI: 10.1155/2018/3631270