Contractor tendering research: going beyond bid/no-bid and markup models
نویسندگان
چکیده
منابع مشابه
Inference from populations: going beyond models.
How are abstract signals, like intent, represented in neural populations? By creating a direct link between neural activity and behavior, brain-computer interfaces (BCIs) can help answer this question. Early instantiations of these devices sought mainly to mimic arm movements: by building models of arm tuning for the neurons, desired arm movements could be read out and used to control various p...
متن کاملDual Business Models: Going beyond Spatial Separation
Despite substantial literature on managing two conflicting business models within one company, little has been done regarding qualitative studies investigating the organizational context and the installed integration and separation mechanisms between these two. Based on organizational context factors and business model elements, using the organizational ambidexterity as theoretical lens, this r...
متن کاملInterpretation Beyond Markup
The meaning conveyed by documents and their markup often goes well beyond what can be inferred from the markup alone. It often depends on context, so that to interpret document markup adequately we must situate markup interpretation within a broader interpretive problem. Markup is just one of several sources of evidence brought to bear in processing digital documents; it must be integrated with...
متن کاملNegotiating Beyond the Bid Price
This paper discusses the limitations of current on-line auction systems and presents our guidelines for more dynamic attribute-based bidding. Our prototype application for airline flight bidding demonstrates our vision for interfaces that facilitate negotiation between buyers and sellers. INTRODUCTION Despite the growth in the number of on-line auction sites, there is still a need for a more dy...
متن کاملIncentive Structure in Public Design- Bid-build Tendering and Its Effects on Projects
Organizational theory argues that the more dynamic and uncertain the environment, the stricter are regulations and organizational structures. Germany’s public sector is restricted by tendering regulations resulting in a strict design-bid-build tendering. These legal regulations, as well as contractual penalties, create an incentive structure which often leads to uncooperative behavior of the pr...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Proceedings of the Institution of Civil Engineers - Management, Procurement and Law
سال: 2017
ISSN: 1751-4304,1751-4312
DOI: 10.1680/jmapl.17.00039