Construction project risk evaluation based on FMEA
نویسندگان
چکیده
منابع مشابه
Project Risk Management Using the Project Risk FMEA
numerous types of development projects, Adams reported similar numbers, where only about one-fourth of all projects entering development become a market success (2004). Datta and Mukerjee (2001) stated that “successful project completion depends to a great extent on the early identifi cation of immediate risks.” Jiang et al. (2002), using factor analysis, confi rmed their hypothesis that risks ...
متن کاملUsing fuzzy FMEA and fuzzy logic in project risk management
Risk management is one of the most important phases of project management and isthe most recently used by many researchers. In this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.Then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy FMEA a...
متن کاملDetermining Optimal Risk Assessment Model in Construction Projects (Case study: steel plant construction project)
Introduction: Identifying occupational hazards and managing occupational safety and health risks is the most important mission and responsibility of the health and safety management system in organizations and adopting coded plans to achieve this is the key to continuously improving this system and promoting it. Method: This descriptive-analytic research has been written to determine the optim...
متن کاملusing fuzzy fmea and fuzzy logic in project risk management
risk management is one of the most important phases of project management and isthe most recently used by many researchers. in this paper, a fuzzy based method wasproposed which identifies different kinds of risks through the project life cycle.then, the project risk magnitude can be obtained in regards to five factors, namely“severity”, “occurrence”, and “not detection” which form fuzzy fmea a...
متن کاملA DST-based approach for construction project risk analysis
Despite its huge potential in risk analysis, the Dempster–Shafer Theory of Evidence (DST) has not received enough attention in construction management. This paper presents a DST-based approach for structuring personal experience and professional judgment when assessing construction project risk. DST was innovatively used to tackle the problem of lacking sufficient information through enabling a...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IOP Conference Series: Earth and Environmental Science
سال: 2019
ISSN: 1755-1315
DOI: 10.1088/1755-1315/330/2/022041