CONSTRUCTION PLANNING METHOD FOR REPETITIVE ACTIVITIES

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Resource-Activity Critical-Path Method for Construction Planning

In this paper, a practical method is developed in an attempt to address the fundamental matters and limitations of existing methods for critical-path method ~CPM! based resource scheduling, which are identified by reviewing the prior research in resourceconstrained CPM scheduling and repetitive scheduling. The proposed method is called the resource-activity critical-path method ~RACPM!, in whic...

متن کامل

Dynamic Planning of Construction Activities Using Hybrid Simulation

Traditional planning methods such as CPM and PERT have been useful tools to manage construction projects. However, the underlying model of these traditional methods often seems to fail to represent real projects as they tend to assume no interrelationship between project components. In reality, project components have complex dynamic feedback process that requires modeling of inherent uncertain...

متن کامل

Path Planning in Repetitive Environments

In this paper we discuss path planning in a special class of dynamic environments, namely repetitive environments, in which the motions of the moving obstacles are periodic (i.e. repetitive). For such environments it is possible to generate a roadmap in a preprocessing stage, which can be used multiple times to quickly solve individual planning queries. This in contrast to general dynamic envir...

متن کامل

Fuzzy Scheduling of Repetitive Construction Projects

Uncertainty is an inherent characteristic of construction projects. Neglecting uncertainties associated with different input parameters in the planning stage could well lead to misleading and/or unachievable project schedules. The objective of this paper is to present a new approach towards scheduling repetitive construction projects while accounting for uncertainty. The paper presents an algor...

متن کامل

A MULTISTAGE EXPANSION PLANNING METHOD FOR OPTIMAL SUBSTATION PLACEMENT

Optimal distribution substation placement is one of the major components of optimal distribution system planning projects. In this paper optimal substation placement problem is solved using Imperialist Competitive Algorithm (ICA) as a new developed heuristic optimization algorithm. This procedure gives the optimal size, site and installation time of medium voltage substation, using their relate...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of Architecture and Planning (Transactions of AIJ)

سال: 2016

ISSN: 1340-4210,1881-8161

DOI: 10.3130/aija.81.1195