Construction of Multi-Project Network Planning Based on BOM and Its Resource Leveling

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

construction and validation of translation metacognitive strategy questionnaire and its application to translation quality

like any other learning activity, translation is a problem solving activity which involves executing parallel cognitive processes. the ability to think about these higher processes, plan, organize, monitor and evaluate the most influential executive cognitive processes is what flavell (1975) called “metacognition” which encompasses raising awareness of mental processes as well as using effectiv...

A Multi-objective Scheduling Model for Solving the Resource-constrained Project Scheduling and Resource Leveling Problems

The project resource leveling problem was proposed to smooth resource usage and reduce resource fluctuation, while the resource-constrained project scheduling problem focuses on minimizing the project duration with limited resources. Solving the two interrelated problems separately is unlikely to result in a globally optimum schedule. The few integrated optimization methods that have been devel...

متن کامل

Resource Leveling in Fuzzy Project Scheduling

In this paper a new method based on fuzzy theory is developed to solve the Project Resource Leveling Problem in fuzzy environment. Resource Leveling Problem attempts to minimize the resource usage fluctuations in project plan. Assuming that the duration of activities and resource requirements are fuzzy, in this method we compute several project characteristics such as earliest times, latest tim...

متن کامل

the effects of planning on accuracy and complexity of iranian efl students’ written narrative task performance

this study compared the different effects of form-focused guided planning vs. meaning-focused guided planning on iranian pre-intermediate students’ task performance. the study lasted for three weeks and concentrated on eight english structures. forty five pre-intermediate iranian students were randomly assigned to three groups of guided planning focus-on-form group (gpfg), guided planning focus...

15 صفحه اول

An Integrated Human Resource Planning Framework for Project-based Organizations in Oil and Gas Industry

The complexities of the oil industry, combined project-based organizations’ complexities, have led the traditional planning of HR being failed. The success of these organizations is based on integrative human resource planning. To this end, the purpose of this study was to determine the factors and components of human resource planning in oil and gas project-based organizations and providing an...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IEEE Access

سال: 2021

ISSN: 2169-3536

DOI: 10.1109/access.2021.3078840