Construction of Full-Precast Frame for High-Rise Building

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Scheduling for High-rise Building Construction Using Simulation Techniques

High-rise buildings are commonly built in densely populated countries or urban areas. A balanced floor construction cycle is critical for construction of the frame structures. The objectives in scheduling the floor cycle are to ensure smooth flows of resources and to optimise the use of formwork and other materials. The floor area is usually divided into zones to allow the labour force and form...

متن کامل

Advantages and Limitations of Precast Concrete Construction in High-rise Buildings: Hong Kong Case Studies

The Hong Kong construction industry heavily relies on conventional cast insitu construction involving extensive use of wet trades and on-site construction processes. The construction activities have been described as “labour intensive, dangerous and polluting”. Recently, the use of prefabrication has increased in the building industry. This paper presents the preliminary findings of an ongoing ...

متن کامل

Prediction Model for Hoisting Time Using Luffing-type Crane for High-rise Building Construction

Hoisting planning for systematic and efficient vertical transportation is one of the key factors for successful completion in high-rise building construction. However, despite this importance, minimal research has been carried out for predicting hoist time, which is a key player in hoisting planning. Therefore, this study proposed a prediction model for vertical hoisting time using a luffing-ty...

متن کامل

Simulation model incorporating genetic algorithms for optimal temporary hoist planning in high-rise building construction

a r t i c l e i n f o Temporary hoist planning is a key factor for successful project completion in a high-rise building construction. Inadequate plans for hoists in the early stages of a project can cause problems such as failing to hoist resources as required or leaving hoists idle. There are two existing approaches, simple formulas and simulation techniques, for planning temporary hoists. Ho...

متن کامل

Business Process Reengineering in The Construction Of Precast Timber Frame Buildings

1.1. The History of Precast Building Precast building has always been a challenge in terms of the attempt to build buildings, above all, more quickly, whilst at the same time meeting all the conditions of good quality construction. This paper deals with the precast mode of construction using a timber frame, of the panel type, suitable for buildings with 3-4 storeys above ground. Therefore, in t...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Concrete Journal

سال: 2015

ISSN: 0387-1061,2186-2753

DOI: 10.3151/coj.53.889