Construction of Full-precast-concrete for High-Rise Building
نویسندگان
چکیده
منابع مشابه
Advantages and Limitations of Precast Concrete Construction in High-rise Buildings: Hong Kong Case Studies
The Hong Kong construction industry heavily relies on conventional cast insitu construction involving extensive use of wet trades and on-site construction processes. The construction activities have been described as “labour intensive, dangerous and polluting”. Recently, the use of prefabrication has increased in the building industry. This paper presents the preliminary findings of an ongoing ...
متن کاملAn Integrated Construction Management System for Site Precast Concrete
In order to manage site precast concrete construction which has been increasing, an integrated construction management system employing a unique 3-D modelling method and analogue process input method was developed. At the planning stage, the system supports interactive planning between member configuration and installation planning by a visual method and with an accurate quantity. At the proces...
متن کاملParametric 3D Modeling in Building Construction with Examples from Precast Concrete
Buildings are complex products containing relatively large numbers of distinct parts that are collected in multiple assemblies for different design, analysis and production purposes. Modeling buildings in fully parametric 3D CAD systems offers numerous benefits in terms of productivity, the ability to rapidly generate design alternatives at different levels, and elimination of errors that resul...
متن کاملEffects of Half-Precast Concrete Slab System on Construction Productivity
A half-precast concrete slab system (HPCSS) is reported to exhibit excellent structural performance when compared with traditional slab systems. However, there is a lack of extant research examining the construction issues of an HPCSS. Thus, in this study, we analyze the construction process and productivity of applying an HPCSS by using a simulation method with the data collected from an actua...
متن کاملScheduling for High-rise Building Construction Using Simulation Techniques
High-rise buildings are commonly built in densely populated countries or urban areas. A balanced floor construction cycle is critical for construction of the frame structures. The objectives in scheduling the floor cycle are to ensure smooth flows of resources and to optimise the use of formwork and other materials. The floor area is usually divided into zones to allow the labour force and form...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Concrete Journal
سال: 2014
ISSN: 0387-1061,2186-2753
DOI: 10.3151/coj.52.330