Construction Equipment, Crane (Process & Construction)
نویسندگان
چکیده
منابع مشابه
Characteristics of Equipment Planning for Multi-Crane Building Construction Sites
This paper purports to provide answers to the following questions with regard to multi-crane building construction sites: (1) Do such construction sites differ from smaller sites only in magnitude, or are there unique characteristics that stem from the size of the site and the multitude of cranes? (2) Is equipment planning for such projects similar to that of projects serviced by a small number...
متن کامل3D-Planning of construction site equipment based on process simulation
Current approaches in planning building site equipment evaluate static periods, e.g. construction phases. As a consequence these states provide a rudimentary optimized layout plan, however without considering the material flow and corresponding interactions in a precise form. Due to dynamic processes, which could obstruct the material flow, an adaption of the equipment layout during individual ...
متن کاملDevelopments in Heavy Construction Equipment
H IST O R Y O F D E V E L O PM E N T An opportunity to discuss the development of any product must include a bit of history so that having observed where we have been one may have a clearer perspective of where we are and may be going. This discussion will try to capture all of these facets. Construction projects of one type or another date back to times before recorded history. M an’s hands we...
متن کاملA Sway Reduction Controller For Construction Crane
A tower crane can be reduced the sway oscillation easily by controlling the rotation acceleration. With the proposed open-loop fast control method which is operated by controlling acceleration, the sway angle of suspended load can be maintained during the movement as well as reduced oscillation during and at the end of movement. In this paper, we design and produce a scaled tower crane with a s...
متن کاملMODEL BASED CONSTRUCTION PROCESS MANAGEMENT Model based construction process management
The purpose of this research was to study how the data management of a main contractor can be improved, in order to provide better client value and more costefficient production. The research focused on methods for reengineering the information management using product modelling as an enabling technology. The methods were tested in pilot tests in which the developed cost and value engineering p...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: JOURNAL OF THE JAPAN WELDING SOCIETY
سال: 2012
ISSN: 0021-4787,1883-7204
DOI: 10.2207/jjws.81.192