CONCRETE PLACING SYSTEM IN DAM USING THE TRAVELLING TOWER CRANE

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Cracks Analysis in Zavin Concrete Dam Using Fracture Mechanics Approach

Most of the existing concrete dams are subjected to cracking. These cracks are caused by various factors such as construction practices, curing, loads and volume change of mass concrete which reduce the efficiency, failure or instability of concrete dams. Using fracture mechanics as a new method to estimate stability and durability of concrete dams is recommended in scientific publications in w...

متن کامل

Analysis of a Tower Crane Accident

Today, steel tower cranes are widely used in the construction sites. In this study, the accident occurred in Turkey in 2006 with the overturning of a tower crane in a construction site and the damage occurred on the nearby buildings due to this accident were taken into consideration. At first, the technical characteristics of the EC-H type tower crane used in that construction and then the reas...

متن کامل

Automatic Design Algorithm for the Tower Crane Foundations

Foundation of tower crane serves to ensure stability against vertical and horizontal forces. If foundation stress is not sufficient, tower crane may be subject to overturning, shearing or foundation settlement. Therefore, engineering review of stable support is a highly critical part of foundation design. However, there are not many professionals who can conduct engineering review of tower cran...

متن کامل

Identification and assessment of human errors among tower crane operators using SHERPA and CREAM techniques

Introduction: Cranes are of the major causes of accidents in the construction industries. As human error mostly causes crane accidents, this study aims to investigate the human errors of tower crane operators in the construction projects using SHERPA and CREAM techniques. Material and Method: In this research, first, all of the tasks of the tower crane operator were identified and analyzed. Th...

متن کامل

3D Tower Crane as a mechatronic tool for education

The paper presents a laboratory model of the 3D tower crane. The arm of the crane is approx 1.2m long and the model is approx. 1.5m heigh. The crane is equipped with three DC motors that control: the rotary movement of the tower, the movement of the trolley and up and down movement of the load. The model is equipped with an unique unit for measuring an angle position of the load. The paper cont...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Doboku Gakkai Ronbunshu

سال: 1991

ISSN: 0289-7806,1882-7187

DOI: 10.2208/jscej.1991.427_281