Conceptual Framework For Supply Chain Risk Management Study on Breakwater Project in Indonesia Case Study : Makassar New Port Breakwater Development Project
نویسندگان
چکیده
Abstract In carrying out its supply chain activities, a project often experiences problems starting from the procurement, production, to delivery processes. Likewise, Makassar New Port Breakwater development must consider risks in planning, implementation and operations. This study aims determine that could potentially occur activities at Indonesia. Furthermore, it will provide information on which fall into high low categories. Moreover, research results of mitigation options for each risk. An essential contribution this is give lesson learned initial data future breakwater project. Based conducted, identified are 38 where dominant risk factor material influences variable C6, namely amount production does not match target. moderate category. From analysis, known contractors suppliers make efforts reduce either preventively or curatively so these do interfere cause significant impact objectives.
منابع مشابه
Software Development Project Risk Management: A New Conceptual Framework
The frequently observed positive impact of adopting risk management strategies on projects’ overall outcome has led many software development organizations to appreciate its significant role in the pursuit of cost reduction, schedule overruns decrease and, generally, improved performance. In line with this issue, this study investigates a wide range of relevant literature, proposes a new concep...
متن کاملResilient Project Management, A New Approache to Develop Project Management Knowledge (Case Study: Infrastructure Civil Projects Management)
Accepetance of the fact that the working context of civil projects is challenging can enhance the resiliency capacity and will increase the project management concentration for improving and developing the software and hardware capabilities to facilitate project success achievement. This article is documented based on a research results in macro-hydropower plants projects management context to ...
متن کاملProject Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملProject Risk Assessment Framework
This study presents a framework for calculating the risk of various projects, especially projects under uncertain circumstances. First, the related literature is reviewed and then the relationship between risk and projects is examined. Using a case study an approach is provided to determine the project risk in uncertain circumstances where sufficient data is not available for decision-making. I...
متن کاملThe Effect of Risk Management on Supply Chain Management (Case Study: SAIPA Company)
The present study aimed to determine the effect of risk management on supply chain management(case study: Saipa Company). This study was applied in terms of purpose and descriptive-correlational in terms of data collection method. The tools used in this study include the 29-item questionnaire. The statistical population of this study included 110 managers of Saipa Company in Tehran. In this stu...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IOP conference series
سال: 2022
ISSN: ['1757-899X', '1757-8981']
DOI: https://doi.org/10.1088/1755-1315/1117/1/012015