Competence-driven project portfolio selection, scheduling and staff assignment
نویسندگان
چکیده
منابع مشابه
Competence-driven project portfolio selection, scheduling and staff assignment
This paper presents a new model for project portfolio selection, paying specific attention to competence development. The model seeks to maximize a weighted average of economic gains from projects and strategic gains from the increment of desirable competencies. As a sub-problem, scheduling and staff assignment for a candidate set of selected projects must also be optimized. We provide a nonlin...
متن کاملa model to solve project scheduling and staff assignment problems
the allocation of human resources to project activities in order to schedule them is one of the closest states to the actual conditions of scheduling problems. but regarding the fact that this problem belongs to the class of np-hard problems; so far the exact methods have only been able to solve the small size problems. in this study, the renewable resources are humans in a way that every staff...
متن کاملIT Project Portfolio Scheduling and Multi-skilled Staff Assignment with Ant Colony Optimization Algorithm
Human resource is a key factor for IT new product development. Considering multi-skilled employees in IT Project Portfolio Scheduling, a mixed integer nonlinear programming model with three optimization objectives is proposed from the view of project or product managers. The three objectives are to maximize the increments of skill efficiency values for all multi-skilled employees, to minimize R...
متن کاملThe project portfolio selection and scheduling problem: mathematical model and algorithms
This paper investigates the problem of selecting and scheduling a set of projects among available projects. Each project consists of several tasks and to perform each one some resource is required. The objective is to maximize total benefit. The paper constructs a mathematical formulation in form of mixed integer linear programming model. Three effective metaheuristics in form of the imperialis...
متن کاملIntegrated Project Scheduling and Staff Assignment with Controllable Processing Times
This paper addresses a decision problem related to simultaneously scheduling the tasks in a project and assigning the staff to these tasks, taking into account that a task can be performed only by employees with certain skills, and that the length of each task depends on the number of employees assigned. This type of problems usually appears in service companies, where both tasks scheduling and...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Central European Journal of Operations Research
سال: 2009
ISSN: 1435-246X,1613-9178
DOI: 10.1007/s10100-008-0081-z