Community-based prehabilitation before elective major surgery: the PREP-WELL quality improvement project

نویسندگان
چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Commentary. Coronary artery revascularization before elective major vascular surgery.

BACKGROUND The benefit of coronary-artery revascularization before elective major vascular surgery is unclear. METHODS We randomly assigned patients at increased risk for perioperative cardiac complications and clinically significant coronary artery disease to undergo either revascularization or no revascularization before elective major vascular surgery. The primary end point was long-term m...

متن کامل

application of upfc based on svpwm for power quality improvement

در سالهای اخیر،اختلالات کیفیت توان مهمترین موضوع می باشد که محققان زیادی را برای پیدا کردن راه حلی برای حل آن علاقه مند ساخته است.امروزه کیفیت توان در سیستم قدرت برای مراکز صنعتی،تجاری وکاربردهای بیمارستانی مسئله مهمی می باشد.مشکل ولتاژمثل شرایط افت ولتاژواضافه جریان ناشی از اتصال کوتاه مدار یا وقوع خطا در سیستم بیشتر مورد توجه می باشد. برای مطالعه افت ولتاژ واضافه جریان،محققان زیادی کار کرده ...

15 صفحه اول

Preoperative anxiety before elective surgery.

OBJECTIVE To ascertain the preoperative anxiety level and different factors responsible in patients admitted for an elective surgical procedure in a tertiary care public hospital. METHODS Anxiety levels were measured in admitted patients of the Civil Hospital, Karachi, Pakistan awaiting elective surgery from October to January 2006. In the afternoon preceding surgery, patients were asked to c...

متن کامل

Non-invasive cardiac stress testing before elective major non-cardiac surgery: population based cohort study

OBJECTIVE To determine the association of non-invasive cardiac stress testing before elective intermediate to high risk non-cardiac surgery with survival and hospital stay. DESIGN Population based retrospective cohort study. SETTING Acute care hospitals in Ontario, Canada, between 1 April 1994 and 31 March 2004. PARTICIPANTS Patients aged 40 years or older who underwent specific elective ...

متن کامل

The perinatal quality collaborative of North Carolina's 39 weeks project: a quality improvement program to decrease elective deliveries before 39 weeks of gestation.

BACKGROUND Despite long-standing guidelines from the American College of Obstetricians and Gynecologists that call for avoiding elective births prior to 39 weeks of gestation, elective deliveries make up almost one-third of US births occurring in weeks 36-38. Poor outcomes are more likely for infants born electively before 39 weeks than for those born at 39 weeks. The Perinatal Quality Collabor...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: BMJ Open Quality

سال: 2020

ISSN: 2399-6641

DOI: 10.1136/bmjoq-2019-000898