Communication-Oriented and Process-Sensitive Planning Support
نویسندگان
چکیده
منابع مشابه
Process-Oriented Planning and Average-Reward Optimality
We argue that many AI planning problems should be viewed as process-oriented, where the aim is to produce a policy or behavior strategy with no termination condition in mind, as opposed to goal-oriented. The full power of Markov decision models, adopted recently for AI planning, becomes apparent with process-oriented problems. The question of appropriate optimality criteria becomes more critica...
متن کاملProcess and Planning Support for Iterative Porting
directed) edges in our representation enumerate only intra-variable value changes. Thus they are straightforward to represent in terms of the vertex abstraction mentioned above. An edge can optionally specify a synchrony constraint with it identifying a set of other edges that it is synchronous with. The constraint is a requirement that
متن کاملProtocol support for optimized, context sensitive request/response communication over connection oriented networks
This paper describes a research project on specification and implementation of a fast, reliable and context sensitive transfer system. The design considers the behavior of various connection oriented networks and the requirements of request/response based communication schemes. First we describe the current situation. This is based on recent measurements and experiences with remote procedure ca...
متن کاملProcess oriented framework to support PLM implementation
Product Lifecycle Management (PLM) innovates as it defines both the product as a central element to aggregate enterprise information and the lifecycle as a new time dimension for information integration and analysis. Because of its potential benefits to shorten innovation lead-times and to reduce costs, PLM has attracted a lot of attention at industry and at research. However, the current PLM i...
متن کاملPlanning Support to Software Process Evolution
The ability to handle changes is a characteristic feature of successful software projects. The problem addressed in this paper is what should be done in project planning and iterative replanning so that the project can react effectively to changes. Thus the work presents research results in software engineering, as well as transfer of methods in knowledge engineering to software engineering, ap...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of E-Planning Research
سال: 2020
ISSN: 2160-9918,2160-9926
DOI: 10.4018/ijepr.2020040101