Commissioning and First Results of the SSRF Phase-II Beamline Project

نویسندگان

چکیده

Abstract The SSRF Phase-II Beamline Project started November 20, 2016 with a 6-year construction period. This project is mainly to construct 18 new beamlines and more than 30 end-stations, as well the corresponding storage ring upgrades, user auxiliary laboratories, beamline technology support infrastructures. Till now, 11 have passed technical acceptance test been in running. remaining seven will be finishing their soon. commissioning of upgraded accelerator successful including lattice modification, 3rd harmonic superconducting cavity installation 650 W helium cryogenic system construction.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Angle Dispersive X-ray Diffraction Beamline on Indus-2 Synchrotron Radiation Source: Commissioning and First Results

Angle dispersive x-ray diffraction (ADXRD) is a basic non destructive tool for the determination of crystal structure. Energy tunability and high flux are added advantages in using synchrotron radiation (SR) source for ADXRD technique. We have installed an ADXRD beamline (BL-12) on Indus-2, the Indian synchrotron source. Indus-2 is a 2.5GeV, 300mA SR source. The beamline consists of a Si (311) ...

متن کامل

Status and Commissioning-results of Bessy Ii

The new Storage Ring BESSY II in Berlin Germany is a dedicated third generation synchrotron radiation source for the VUV and soft X-ray spectral range [1]. On April 22, 1998 a 1.7 GeV electron beam was stored for the first time. Despite a relatively short time for commissioning of the synchrotron radiation source, the milestones were met as scheduled. Accelerator parameters that determine the q...

متن کامل

efl students gender and socioeconomic status: the use of politeness strategies in the first and second languages

within the components of communicative competence, a special emphasis is put on the “rules of politeness,” specifically the politeness strategies (brown and levinson, 1978) that speakers deploy when performing the request speech act. this is because the degree of imposition that making a request places upon one’s interlocutor(s) has been seen to be influenced by several factors among which, as ...

The Low Density Matter (LDM) beamline at FERMI: optical layout and first commissioning

The Low Density Matter (LDM) beamline has been built as part of the FERMI free-electron laser (FEL) facility to serve the atomic, molecular and cluster physics community. After the commissioning phase, it received the first external users at the end of 2012. The design and characterization of the LDM photon transport system is described, detailing the optical components of the beamline.

متن کامل

Frequency of tobacco use among students in Varamin city: Results of the first phase of the PAD project study (Tobacco Use Prevention in Schools)

Introduction: Smoking among adolescents is a matter of concern that has attracted the attention of many officials and experts in various fields such as health-care, psychology, and sociology. This study was conducted in 2019 to evaluate the status of smoking in students at the individual and familial levels. Materials and Methods: This study was performed based on the analysis of the results of...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of physics

سال: 2022

ISSN: ['0022-3700', '1747-3721', '0368-3508', '1747-3713']

DOI: https://doi.org/10.1088/1742-6596/2380/1/012004