Combining BIM and lean methods for scheduling for verifying and communicating demolition processes in an early project stage

نویسندگان

چکیده

Today demolition projects face various challenges: Health and safety regulations, environmental impacts tight construction schedules in addition to the involvement of many stakeholders with different backgrounds professions. Furthermore, there is a vast amount project data available forms. By combining BIM data, other Lean schedule, this paper presents method for visualizing simulating at an early stage before nomination general contractor, little additional effort client.

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

development and implementation of an optimized control strategy for induction machine in an electric vehicle

in the area of automotive engineering there is a tendency to more electrification of power train. in this work control of an induction machine for the application of electric vehicle is investigated. through the changing operating point of the machine, adapting the rotor magnetization current seems to be useful to increase the machines efficiency. in the literature there are many approaches wh...

15 صفحه اول

passivity in waiting for godot and endgame: a psychoanalytic reading

this study intends to investigate samuel beckett’s waiting for godot and endgame under the lacanian psychoanalysis. it begins by explaining the most important concepts of lacanian psychoanalysis. the beckettian characters are studied regarding their state of unconscious, and not the state of consciousness as is common in most beckett studies. according to lacan, language plays the sole role in ...

the search for the self in becketts theatre: waiting for godot and endgame

this thesis is based upon the works of samuel beckett. one of the greatest writers of contemporary literature. here, i have tried to focus on one of the main themes in becketts works: the search for the real "me" or the real self, which is not only a problem to be solved for beckett man but also for each of us. i have tried to show becketts techniques in approaching this unattainable goal, base...

15 صفحه اول

Developing Robust Project Scheduling Methods for Uncertain Parameters

A common problem arising in project management is the fact that the baseline schedule is often disrupted during the project execution because of uncertain parameters. As a result, project managers are often unable to meet the deadline time of the milestones. Robust project scheduling is an effective approach in case of uncertainty. Upon adopting this approach, schedules are protected against po...

متن کامل

islanding detection methods for microgrids

امروزه استفاده از منابع انرژی پراکنده کاربرد وسیعی یافته است . اگر چه این منابع بسیاری از مشکلات شبکه را حل می کنند اما زیاد شدن آنها مسائل فراوانی برای سیستم قدرت به همراه دارد . استفاده از میکروشبکه راه حلی است که علاوه بر استفاده از مزایای منابع انرژی پراکنده برخی از مشکلات ایجاد شده توسط آنها را نیز منتفی می کند . همچنین میکروشبکه ها کیفیت برق و قابلیت اطمینان تامین انرژی مشترکان را افزایش ...

15 صفحه اول

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Computing in construction

سال: 2023

ISSN: ['2684-1150']

DOI: https://doi.org/10.35490/ec3.2023.162