Collar Option Model for Managing the Cost Overrun Caused by Change Orders
نویسندگان
چکیده
منابع مشابه
Collar Option Model for Managing the Cost Overrun Caused by Change Orders
Effective change order management is very important in maintaining the financial sustainability of various stakeholders related to construction projects by minimizing cost overruns. In this study, we propose a zero-cost risk management approach based on the collar option model in order to control for the loss caused by change orders, the main cause of cost overruns in construction projects. We ...
متن کاملManaging Cost Overrun Risk in Project Funding Allocation
This paper discusses decision making of project funding allocation under uncertain project costs. Because project costs are uncertain and funding allocations may not necessarily match the costs required, each project is inherently subject to a cost overrun risk (COR). In this paper, a model is proposed in which project cost is treated as a factor with a probability density function. The decisio...
متن کاملOrders of Magnitude Change in Phenotype Rate Caused by Mutation
Orders of magnitude change in phenotype rate caused by mutation To the Editor, In a forceful article Duesberg and his colleagues [5] reviewed the impressive amount of research results on cancer accumulated over 100 years. It confirms the current conclusion that considering all available experimental results and clinical observations there is no cancer theory without major difficulties, includin...
متن کاملOrders of Magnitude Change in Phenotype Rate Caused by Mutation
Orders of magnitude change in phenotype rate caused by mutation To the Editor, In a letter entitled, " Orders of magnitude change in phenotype rate caused by mutation " Ping Ao points out that " there is no cancer theory without major difficulties , including the prevailing gene-based cancer theories " [1]. In the light of this argument Ao has also reviewed our article, 'The chromosomal basis o...
متن کاملA Novel Market Optimization Model in order to Minimizing Environmental Cost Caused by Plants
Nowadays generation capacity in traditional grid depends on fossil fuels and contributes significantly to the increase of pollution emission. In deregulated grids in addition to using demand response programs (DRPs) to reducing the cost of electricity production, peak clipping and improve reliability use of green Plants such as hydro plant, wind plant become widespread. In a smart grid, end use...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Sustainability
سال: 2015
ISSN: 2071-1050
DOI: 10.3390/su70810649