Collaborative supply chain planning and scheduling of construction projects

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

an inventory–scheduling model for supply chain of construction project

one of the important problems in project management is lack of available resources in proper time at project site that leads to lack of project implementation in due date. this problem may be lead to time delay in sending resources from suppliers and related origins in supply chain to project site. therfore, to better resources managmenet and also the improvement of supply chain condition, the ...

متن کامل

Human Contribution to Collaborative Supply Chain Planning and Scheduling: A Case Study in Automotive Industry

The hierarchical production planning and control has been disputed since the early 1990s and a paradigm shift has emerged that highlights the role of humans in controlling job shops. However, most approaches to supply chain management still follow the conventional hierarchical approach, which establishes the interaction between supply partners at the management control level and does not consid...

متن کامل

Integrated Process Planning and Active Scheduling in a Supply Chain-A Learnable Architecture Approach

Through the lens of supply chain management, integrating process planning decisions and scheduling plans becomes an issue of great challenge and importance. Dealing with the problem paves the way to devising operation schedules with minimum makespan; considering the flexible process sequences, it can be viewed as a fundamental tool for achieving the scheme, too. To deal with this integration, t...

متن کامل

Exploring Information and Communications Technology in Collaborative Supply Chain Planning

This thesis deals with the role of information and communications technology (ICT) in supply chain settings where partners collaborate on planning and control. Recent ICT developments offer numerous opportunities to handle information between partners in supply chains. Collaborative planning, forecasting and replenishment (CPFR) is a collaboration concept that is often associated with ICT. Howe...

متن کامل

Integrated process planning and scheduling in a supply chain

This paper deals with the integration of process planning and scheduling, which is one of the most important functions in a supply chain to achieve high quality products at lower cost, lower inventory, and high level of performance. Solving the problem is essential for the generation of flexible process sequences with resource selection and for the decision of the operation schedules that can m...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: IFAC-PapersOnLine

سال: 2020

ISSN: 2405-8963

DOI: 10.1016/j.ifacol.2020.12.2858