Coaxial 30 kV connectors for the RG220/U cable: 20 years of operational experience
نویسندگان
چکیده
منابع مشابه
Effects of Stress Grading Materials’ Properties on the Performance of 20-kV Cable Terminations
Stress grading (SG) layer in cable terminations limits the critical electric field and properties of SG materials are important issues which have to be considered during manufacturing and selecting procedure. In this paper, two different types of (SG) materials are analyzed by both theory and test. According to the applied theory, important parameters as: electrical resistivity, breakdown volta...
متن کاملAn Off-Center “Coaxial” Cable
A “coaxial” transmission line has inner conductor of radius a and outer conductor of radius b, but the axes of these two cylinders are offset by a small distance δ ¿ b. Deduce the capacitance and inductance per unit length, and the impedance Z, accurate to order δ/b. The (relative) dielectric constant and permeability of the medium between the two conductors both unity. The relevant frequencies...
متن کامل20 Years of Operational Forecasting at Oceanweather
The rapid evolution of numerical wave prediction models over the past three decades has been closely linked with the desire to improve operational wave forecasting systems. For example, the P-T-B directional spectral wave model (Pierson et al., 1966), supported initially to develop new wave climate data for improved ship design, was implemented at the Fleet Numerical Oceanography (FNOC, now FNM...
متن کاملPassive Intermodulation Distortion in Connectors, Cable and Cable Assemblies
Introduction: Although not a new problem and well known to the satellite communications and microwave trunking industries, until the use of cellular phones became widespread, Passive Intermodulation Distortion (PIM) was of little concern to the connector designer. Until five years ago, most connector engineers had never heard of the phenomenon. Now, due to the frequency plans of today’s modern ...
متن کاملOperational Improvement Approaches over the Last 30 Years
This paper reviews the Operational Improvement approaches of the last 30 years in Australia. They have included Group Technology, ERP, JIT, WCM, BP-R, TQM and Now Lean Manufacturing. It identifies what each approach consists of, the initial launch, implementation efforts and results. The paper finds that only the WCM program has had any real success. The reasons for the high failure rate for th...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: IEEE Electrical Insulation Magazine
سال: 2000
ISSN: 0883-7554
DOI: 10.1109/57.833655