Coal Preparation Techniques for Coke Making

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Advances in Nde Techniques for Delayed Coke Drums

Delayed coke drums are operated under severe conditions of cyclic heating and forced cooling that apply repetitive thermal stresses to the drum walls. It has long been recognized that the ultimate failure mechanism for coke drums is weld cracking due to low cycle fatigue caused by these thermal stresses. It is also known that coke drums distort and bulge in service and that these bulges can be ...

متن کامل

Ranking and comparing of traditional and industrial coke making by TOPSIS technique in Shahrood Simin Coke Company

Various traditional and industrial coke making techniques were discussed based on their limitations and production capacities, and the criteria such as the quality and size of coke production, amount of coke crumb, amount of investment, amount of operational costs, labor force and mechanization. In this work, the rankings of various traditional and industrial coke making techniques were carried...

متن کامل

A Novel Approach for Beneficiation and Dewatering of Coal Fines for Indian Coal Preparation Plant

An attempt has been made to beneficiate the Indian coking coal fines by a combination of Spiral, flotation and Oleo Flotation processes. Beneficiation studies were also carried out on 0.5mm coal fines using flotation and oleo flotation by splitting at size 0.063mm.Size fraction of 0.5mm-0.063mm and -0.063mm size were treated in flotation and Oleo flotation respectively. The washability studies ...

متن کامل

Survey of noise in coal preparation plants.

In response to the continuing problem of noise induced hearing loss (NIHL) among mine workers, the National Institute for Occupational Safety and Health (NIOSH) has conducted numerous noise surveys in coal preparation plants. The research, consisting of worker dose monitoring, task observations, and equipment noise profiling, was completed in eight separate preparation plants. Worker dose monit...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Tetsu-to-Hagane

سال: 1987

ISSN: 0021-1575,1883-2954

DOI: 10.2355/tetsutohagane1955.73.15_1846