Clinical skills evaluation in a resource-constrained environment
نویسندگان
چکیده
منابع مشابه
A CONSTRAINED SOLID TSP IN FUZZY ENVIRONMENT: TWO HEURISTIC APPROACHES
A solid travelling salesman problem (STSP) is a travelling salesman problem (TSP) where the salesman visits all the cities only once in his tour using dierent conveyances to travel from one city to another. Costs and environmental eect factors for travelling between the cities using dierent conveyances are dierent. Goal of the problem is to nd a complete tour with minimum cost that damages the ...
متن کاملComparison of Self, Peer, and Clinical Teacher Evaluation in Clinical Skills Evaluation Process of Midwifery Students
Introduction: In order to have a precise judgment on performance, a variety of data resources are needed. In this regard, experts emphasize on employing different assessment groups for determining achievement of learning objectives by students. This study was performed to compare self, peer, and teacher evaluation in the process of midwifery students' clinical skills evaluation at delivery roo...
متن کاملA THEORETICALLY CORRECT RESOURCE USAGE VISUALIZATION FOR THE RESOURCE-CONSTRAINED PROJECT SCHEDULING PROBLEM
The cumulative resource constraints of the resource-constrained project scheduling problem (RCPSP) do not treat the resource demands as geometric rectangles, that is, activities are not necessarily assigned to the same resource units over their processing times. In spite of this fact, most papers on resource-constrained project scheduling mainly in the motivation phase use a strip packing of re...
متن کاملConstrained Renewable Resource Allocation in Fuzzy Metagraphs via Min-Slack
This paper discusses that the fuzzy metagraphs can be used as a tool for scheduling and control of fuzzy projects. Often, available resources for executing projects may be limited. It is assumed the resources required to accomplish each activity of project (metagraph edges) is renewable. One of the common methods for scheduling projects is using the min-slack. So, first, the forward and bac...
متن کاملA multi-objective resource-constrained optimization of time-cost trade-off problems in scheduling project
This paper presents a multi-objective resource-constrained project scheduling problem with positive and negative cash flows. The net present value (NPV) maximization and making span minimization are this study objectives. And since this problem is considered as complex optimization in NP-Hard context, we present a mathematical model for the given problem and solve three evolutionary algorithms;...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Medical Education
سال: 2008
ISSN: 0308-0110,1365-2923
DOI: 10.1111/j.1365-2923.2008.03065.x