Chaotic Behavior of a Single Machine Scheduling Problem with an Expected Mean Flow Time Measure

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Minimizing Mean Flow Time for the Two-Machine Scheduling Problem with a Single Server

Abstract In this paper, we consider the problem of scheduling a set of jobs on two parallel machines to minimize the sum of completion times. Each job requires a setup which must be done by a single server. It is known that this problem is strongly NP-hard. We propose two mixed integer linear programming models and a simulated annealing algorithm. The performance of these algorithms is evaluate...

متن کامل

A New Branch-and-Bound for the Problem of Mean Completion Time for the Single Machine with Release Time

Preemptively scheduling a set of independent jobs with release time on one processor is a historical problem. In this paper, the same problem has been considered in which objective is to minimize the mean flow time. To prepare a perfect branch-and-bound, some optimality conditions have been represented and they have been compared with the optimality conditions which have been proposed before. O...

متن کامل

JIT single machine scheduling problem with periodic preventive maintenance

This article investigates a JIT single machine scheduling problem with a periodic preventive maintenance. Also to maintain the quality of the products, there is a limitation on the maximum number of allowable jobs in each period. The proposed bi-objective mixed integer model minimizes total earliness-tardiness and makespan simultaneously. Due to the computational complexity of the problem, mult...

متن کامل

Single Machine Scheduling Problem with Precedence Constraints and Deteriorating Jobs

This paper considers the single machine scheduling problem with precedence constraints and deteriorating jobs. A mathematical model based on binary integer programming (BIP) is developed. By these precedence constraints, jobs can not start before completion of its all predecessors. The represented model is in two steps, in step one the earliest starting time of each job is computed, then the re...

متن کامل

a new branch-and-bound for the problem of mean completion time for the single machine with release time

preemptively scheduling a set of independent jobs with release time on one processor is a historical problem. in this paper, the same problem has been considered in which objective is to minimize the mean flow time. to prepare a perfect branch-and-bound, some optimality conditions have been represented and they have been compared with the optimality conditions which have been proposed before. o...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Journal of the Korean Operations Research and Management Science Society

سال: 2016

ISSN: 1225-1119

DOI: 10.7737/jkorms.2016.41.1.087