CentralizedVERSUSdecentralized production planning

نویسندگان
چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Production planning considering undesirable outputs-A DEA

While the conventional DEA based production plans aim to minimize all the inputs consumption and maximize all the outputs production, there are many real world production systems may also generate undesirable by-products. One methodological difficulty associated with the previous DEA-based production planning models is how to incorporate undesirable factors in the planning models, while the sim...

متن کامل

An integrated production-marketing planning model With Cubic production cost function and imperfect production process

The basic assumption in the traditional inventory model is that all outputs are perfect items. However, this assumption is too simplistic in the most real-life situations due to a natural phenomenon in a production process. From this it is deduced that the system produces non-perfects items which can be classified into four groups of perfect, imperfect, reworkable defective and non-reworkable d...

متن کامل

Using planning steps for production planning

new planning methodology for coping with this uncertainty caused by disruptions is presented. Planning steps described by their preconditions and their consequences are used for material requirements planning and scheduling. Preconditions of planning steps have to be satisfied in a certain state of environment for the planning steps to be applicable. Consequences of planning steps change the st...

متن کامل

Uncertain aggregate production planning

Based on uncertainty theory, multiproduct aggregate production planning model is presented, where the market demand, production cost, subcontracting cost, etc., are all characterized as uncertain variables. The objective is to maximize the belief degree of obtaining the profit more than the predetermined profit over the whole planning horizon. When these uncertain variables are linear, the obje...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: RAIRO - Operations Research

سال: 2006

ISSN: 0399-0559,1290-3868

DOI: 10.1051/ro:2006017