Central station generation of power at mining centers

نویسندگان

چکیده

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Regulating BETs at central station

1754 INSIGHTS | The Journal of Experimental Medicine The establishment of complex behaviors, memory, and language has long fascinated humanity. It is, after all, what makes us human. Understanding this complexity presents one of the most significant challenges in biomedical research. Autism spectrum disorders (ASDs) are a group of neurodevelopmental disorders often characterized by repetitive a...

متن کامل

Maintenance Staff Scheduling at Afam Power Station

This paper describes the optimization of maintenance workforce scheduling at Afam power station in Nigeria. The objective is to determine the optimum schedule to satisfy growing maintenance labour requirements with minimum cost and highest efficiency. Three alternative maintenance workforce schedules are compared. The first alternative is to continue with the traditional five-day workweek sched...

متن کامل

Technical possibility assessment of creating wind power station at Soltanieh zone of Zanjan province

Due to increasing expansion of energy consumption and also the decrease and tendency towardsending fossil energy reserves, the current energy cycle needs to use alternative energy speciallywind energy, because it’s considerably cheaper than other recycling sources. The presentresearch investigates suitable possibility of exploiting wind energy to create wind power stationin Soltanieh zone of Za...

متن کامل

Power Consumption Minimization of Khormoj Compressor Station

Arguably, the natural gas transmission pipeline infrastructure in Iran represents one of the largest and most complex mechanical systems in the world. The optimization of large gas trunk lines known as IGAT results in reduced fuel consumption or higher capability and improves pipeline operation. In the current study, a single-objective optimization was conducted for Khormoj compressor station o...

متن کامل

Complete Francis turbine flow simulation at Derbendikan power station

This paper presents the results of simulations of the complete three-dimensional fluid flow through the Spiral Casing, Stay Vane, Guide Vane, and then through the Francis turbine runner of the Derbendikan power station. To investigate the flow in the Francis turbine and also to identify the loads acting on the turbine blades, a three-dimensional model was prepared according to specifications pr...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Proceedings of the American Institute of Electrical Engineers

سال: 1911

ISSN: 0097-2444

DOI: 10.1109/paiee.1911.6660076