Cause of Construction Delay - Theoretical Framework
نویسندگان
چکیده
منابع مشابه
A theoretical framework of divorcing couples experience
Divorce is an event affecting couples, children, families, and community. Little is known about the perception of Iranian couples who intended to get divorced with regard to the process of decision making on divorce. The purpose of this study was to build a theory about the process that leads the couples to get divorced. The grounded theory in qualitative paradigm was used. Ten couples were int...
متن کاملCauses of Final Account Closing Delay: A Theoretical Framework
Delay can be defined as time overrun or extension of time to complete the project. There are high possibilities that delay issues in final account closing cannot be avoided especially in construction project in Malaysia which is unique and dynamic in the terms of nature of design and technical skill. Delay in final account closing is a situation when the actual planning (time and budget allocat...
متن کاملA Production Model for Construction: A Theoretical Framework
The building construction industry faces challenges, such as increasing project complexity and scope requirements, but shorter deadlines. Additionally, economic uncertainty and rising business competition with a subsequent decrease in profit margins for the industry demands the development of new approaches to construction management. However, the building construction sector relies on practice...
متن کاملUnderstanding construction delay analysis – the role of pre-construction programming
Modern construction projects commonly suffer from delay in their completions. The resolution of time and cost claims consequently flowing from such delays continues to remain a difficult undertaking for all project parties. A common approach often relied on by contractors and their employers (or their representatives) to resolve this matter involves applying various delay analysis techniques, w...
متن کاملTheoretical Analysis of GPRS Throughput and Delay
We present a theoretical analysis of the radio link control layer and media access control layer of the General Packet Radio Service, a packet data overlay of GSM. The analysis focuses on the effects of retransmissions on the throughput of an uplink Packet Data Traffic Channel. We are especially interested in the relative throughput of the four GPRS coding schemes. We find in addition to channe...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Procedia Engineering
سال: 2011
ISSN: 1877-7058
DOI: 10.1016/j.proeng.2011.11.192