The key parameters of pressure relief pre-splitting blasting technology (PRPBT) contribute to the implementation effect goaf-side entry by roof cutting (GSERC). This study is an attempt design including height, angle, spacing between boreholes, charge structure and sealing length using theoretical analysis, numerical simulation field implementation. basic quality index main 666.27, combined with peeping observation result, belongs category a hard roof. Different from weakened compound roof, unreasonable PRPBT for lead three problems insufficient effect, suspension in goaf serious damage rock mass rib. closely related parameters, parameters. Hence, solve those problems, new strategy was proposed based on optimized directions increasing decreasing changing adjusting length. According results calculation, situ measurement, spaced distance were determined as 10 m, 15°, 500 mm, 4 + 3 2 2.4 respectively. fissure rate assess developed different schemes. achieved better entry, eliminated goaf. this could other similar coal mines under condition

برای دانلود باید عضویت طلایی داشته باشید

برای دانلود متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

Stability Control of Retained Goaf-Side Gateroad under Different Roof Conditions in Deep Underground Y Type Longwall Mining

Stability of the retained goaf-side gateroad (RGSG) is influenced mainly by the movements of the roof strata near coal seam after coalface passes by. To make effective controlling technology for the stability of the RGSG, we analyze the roof structure over the RGSG to illustrate the mechanism causing the RGSG instability under different roof conditions. We then examine the dynamic evolution of ...

متن کامل

technical and legal parameters for determination of river boundary,( case study haraz river)

چکیده با توسعه شهر نشینی و دخل و تصرف غیر مجاز در حریم رودخانه ها خسارات زیادی به رودخانه و محیط زیست اطراف آن وارده می شود. در حال حاضر بر اساس آئین نامه اصلاح شده بستر و حریم رودخانه ها، حریم کمی رودخانه که بلافاصله پس از بستر قرار می گیرد از 1 تا20 متر از منتهی الیه طرفین بستر رودخانه تعیین، که مقدار دقیق آن در هر بازه از رودخانه مشخص نیست. در کشورهای دیگر روشهای متفاوتی من جمله: درصد ریسک...

15 صفحه اول

a study on insurer solvency by panel data model: the case of iranian insurance market

the aim of this thesis is an approach for assessing insurer’s solvency for iranian insurance companies. we use of economic data with both time series and cross-sectional variation, thus by using the panel data model will survey the insurer solvency.

Design Parameters of Roof Support Systems for Pre-driven Longwall Recovery Rooms

Reduction in the recovery time required and improvements in safety during a longwall face move have compelled coal mine operators to examine and use predriven longwall recovery rooms. The recovery entry is developed at the longwall stop position and supported ahead of time so that the required combinations of standing and internal supports can be installed before the longwall face approaches. A...

متن کامل

Roof Tunnel Stability by Wedge Analysis

A jointed rock mass presents a more complex design problem than the other rock masses. The complexity arises from the number (greater than two) of joint sets which define the degree of discontinuity of medium.  The condition that arises in these types of rock masses is the generation of discrete rock blocks, of various geometries. They defined by the natural fracture surfaces and the excavation...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Processes

سال: 2023

ISSN: ['2227-9717']

DOI: https://doi.org/10.3390/pr11020350