Capital- and resource-constrained project scheduling with net present value optimization
نویسندگان
چکیده
منابع مشابه
Project Scheduling with Simultaneous Optimization, Time, Net Present Value, and Project Flexibility for Multimode Activities with Constrained Renewable Resources
Project success is assessed based on various criteria, every one of which enjoys a different level of importance for the beneficiaries and decision makers. Time and cost are the most important objectives and criteria for the project success. On the other hand, reducing the risk of finishing activities until the predetermined deadlines should be taken into account. Having formulated the problem ...
متن کاملMaximising the Net Present Value for Resource-Constrained Project Scheduling
The Resource-constrained Project Scheduling Problem (Rcpsp), in which a schedule must obey the resource constraints and the precedence constraints between pairs of activities, is one of the most studied scheduling problems. An important variation of the problem (RcpspDc) is to find a schedule which maximises the net present value (discounted cash flow), when every activity has a given cash flow...
متن کاملUncertain Resource-Constrained Project Scheduling Problem with Net Present Value Criterion
On the basis of uncertainty theory, plenty of researches have been done on uncertain resource-constrained project scheduling problems. Instead of minimizing the makespan, in this paper, we address the maximization of net present value of a project’s cash flows when activity durations are assumed to be uncertain. In addition to precedence constraint and resource constraint involved in resource-c...
متن کاملProject scheduling optimization for contractor’s Net present value maximization using meta-heuristic algorithms: A case study
Today's competitive conditions have caused the projects to be carried out in the least possible time with limited resources. Therefore, managing and scheduling a project is a necessity for the project. The timing of a project is to specify a sequence of times for a series of related activities. According to their priority and their latency, so that between the time the project is completed and ...
متن کاملProject Portfolio Selection with the Maximization of Net Present Value
Projects scheduling by the project portfolio selection, something that has its own complexity and its flexibility, can create different composition of the project portfolio. An integer programming model is formulated for the project portfolio selection and scheduling.Two heuristic algorithms, genetic algorithm (GA) and simulated annealing (SA), are presented to solve the problem. Results of cal...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: European Journal of Operational Research
سال: 2017
ISSN: 0377-2217
DOI: 10.1016/j.ejor.2016.07.019