CAPACITY EXPANSION IN STAGES UNDER BUDGET CONSTRAINT
نویسندگان
چکیده
منابع مشابه
The budget constrained r-interdiction median problem with capacity expansion
In this article, we elaborate on a budget constrained extension of the r -interdiction median problem with fortification (RIMF). The objective in the RIMF is to find the optimal allocation of protection resources to a given service system consisting of p facilities so that the disruptive effects of r possible attacks to the system are minimized. The defender of the system needs to fortify q fac...
متن کاملCapacity expansion under a service level constraint for uncertain demand with lead times
For a service provider facing stochastic demand growth, expansion lead times and economies of scale complicate the expansion timing and sizing decisions. We formulate a model to minimize the infinite horizon expected discounted expansion cost under a service level constraint. The service level is defined as the proportion of demand over an expansion cycle that is satisfied by available capacity...
متن کاملProfit maximization solid transportation problem under budget constraint using fuzzy measures
Fixed charge solid transportation problems are formulated as profit maximization problems under a budget constraint at each destination. Here item is purchased in different depots at different prices. Accordingly the item is transported to different destinations from different depots using different vehicles. Unitsare sold from different destinations to the customers at different selling prices...
متن کاملOnline Knapsack Problem under Expected Capacity Constraint
Online knapsack problem is considered, where items arrive in a sequential fashion that have two attributes; value and weight. Each arriving item has to be accepted or rejected on its arrival irrevocably. The objective is to maximize the sum of the value of the accepted items such that the sum of their weights is below a budget/capacity. Conventionally a hard budget/capacity constraint is consid...
متن کاملOptimal Preventive Maintenance Policy under a Budget Constraint
We design an optimal preventive maintenance policy for a system of N items that minimizes the total expected maintenance cost. We assume that the budget for preventive maintenance is limited and constrained. The problem has a finite time horizon and we consider constant inter-preventive maintenance times for every item. The resulting nonlinear optimization problem is reformulated as a binary in...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Doboku Gakkai Ronbunshu
سال: 1984
ISSN: 0289-7806,1882-7187
DOI: 10.2208/jscej.1984.347_117