Capacitated lot-sizing with sequence dependent setup costs

نویسندگان

چکیده

برای دانلود رایگان متن کامل این مقاله و بیش از 32 میلیون مقاله دیگر ابتدا ثبت نام کنید

اگر عضو سایت هستید لطفا وارد حساب کاربری خود شوید

منابع مشابه

A two-stage heuristic for single machine capacitated lot-sizing and scheduling with sequence-dependent setup costs

This paper considers a single machine capacitated lot-sizing and scheduling problem. The problem is to determine the lot sizes and the sequence of lots while satisfying the demand requirements and the machine capacity in each period of a planning horizon. In particular, we consider sequence-dependent setup costs that depend on the type of the lot just completed and on the lot to be processed. T...

متن کامل

Lot sizing and scheduling with sequence-dependent setup costs and times and efficient rescheduling opportunities

This paper deals with lot sizing and scheduling for a single-stage, single-machine production system where setup costs and times are sequence dependent. A large-bucket mixed integer programming (MIP) model is formulated which considers only e$cient sequences. A tailor-made enumeration method of the branch-and-bound type solves problem instances optimally and e$ciently. The size of solvable case...

متن کامل

Lot sizing and scheduling with sequence-dependent setup costs and times and e$cient rescheduling opportunities

This paper deals with lot sizing and scheduling for a single-stage, single-machine production system where setup costs and times are sequence dependent. A large-bucket mixed integer programming (MIP) model is formulated which considers only e$cient sequences. A tailor-made enumeration method of the branch-and-bound type solves problem instances optimally and e$ciently. The size of solvable case...

متن کامل

A Capacitated Lot Sizing Problem with Stochastic Setup Times

In this paper, we study a Capacitated Lot Sizing Problem with Stochastic Setup Times (CLSP-SST).We describe a mathematical model that considers both regular costs (including production, setup and inventory holding costs) and expected overtime costs (related to the excess usage of capacity). The CLSP-SST is formulated as a two-stage stochastic programming problem. A procedure is proposed to effe...

متن کامل

Lot Sizing and Scheduling with Sequence Dependent Setup Costs and times and Eecient Rescheduling Opportunities

1 Summary: This paper deals with lot sizing and scheduling for a single-stage production system where setup costs and times are sequence dependent. A large bucket mixed integer programming (MIP) model is formulated which considers only eecient sequences. A tailor-made enumeration method of the branch-and-bound type solves problem instances optimally and eeciently. Furthermore, it will become cl...

متن کامل

ذخیره در منابع من


  با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید

ژورنال

عنوان ژورنال: Operations-Research-Spektrum

سال: 1996

ISSN: 0171-6468,1436-6304

DOI: 10.1007/bf01539882