Capacitated lot-sizing problem with production carry-over and set-up splitting: mathematical models
نویسندگان
چکیده
منابع مشابه
Solving a multi-level capacitated lot sizing problem with multi-period setup carry-over via a fix-and-optimize heuristic
This paper presents a new algorithm for the dynamic Multi-Level Capacitated Lot Sizing Problem with Setup Carry-Overs (MLCLSP-L). The MLCLSP-L is a big-bucket model that allows the production of any number of products within a period, but it incorporates partial sequencing of the production orders in the sense that the first and the last product produced in a period are determined by the model....
متن کاملCapacitated lot sizing models: a literature review
In the present paper, we discuss one of the many processes arising in the context of supply chain management, namely production planning. We focus on one type of production planning models called capacitated lot sizing models. These models appear to be well suited for the usually rather in exible production resources found in the process industries. We review the literature on single-level sing...
متن کاملA Multi-level Capacitated Lot-sizing Problem with Safety Stock Deficit and Production Manners: A Revised Simulated Annealing
[1] Corresponding author e-mail: [email protected] [1] Corresponding author e-mail: [email protected] Lot-sizing problems (LSPs) belong to the class of production planning problems in which the availability quantities of the production plan are always considered as a decision variable. This paper aims at developing a new mathematical model for the multi-level ca...
متن کاملA Capacitated Lot Sizing Problem with Stochastic Setup Times
In this paper, we study a Capacitated Lot Sizing Problem with Stochastic Setup Times (CLSP-SST).We describe a mathematical model that considers both regular costs (including production, setup and inventory holding costs) and expected overtime costs (related to the excess usage of capacity). The CLSP-SST is formulated as a two-stage stochastic programming problem. A procedure is proposed to effe...
متن کاملCapacitated Lot-sizing with Linked Production Quantities of Adjacent Periods
One of the most important tasks operations manager are confronted with is to determine production quantities over a medium-size planning horizon such that demand is met, scarce production facilities are not overloaded and that the sum of holding and setup costs is minimized. For the single machine case the well-known Capacitated Lot-Sizing Problem (CLSP) has been proposed to determine minimum c...
متن کاملذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: International Journal of Production Research
سال: 2015
ISSN: 0020-7543,1366-588X
DOI: 10.1080/00207543.2015.1076942