The exploitation of underground coal resources has stepped up local economic and social development significantly. However, it was inevitable that time-dependent surface settlement would occur above the mined-out voids. Subsidence associated with geo-mining can last from several months to scores years seriously impact infrastructure, city planning, space utilization. This paper addresses problems in predicting progressive residual subsidence. subsidence process divided into three phases: a duration period, long-term period. Then, novel mathematical model calculating proposed based on logistic time function. After period extrapolated according threshold sinking rate. validation for estimated light observed situ data. results demonstrate function is an ideal reflecting features downward movement, rate, acceleration. coefficient, which plays crucial role settling, varies directly parameters inversely time. influence amount data predicted values pronounced. Observation must extend beyond active Thus back-calculated measurement be reliable. Conversely, deviation between predictive field-based ones significant. conclusions this study guide project design resulting longwall operation. affords insights valuable land reutilization, stabilization estimation foundation abandoned workface.
منابع مشابه
Analysis on the Improved Time Function Model of Surface Subsidence
The surface subsidence process induced by underground coal mining is a dynamic process, but the existing time function models can’t reflect the regularity of surface subsidence with time properly. By investigating the whole development process of subsidence, subsidence velocity and subsidence acceleration with time, a new time function model is presented that takes the dynamic characteristics i...
متن کاملmortality forecasting based on lee-carter model
over the past decades a number of approaches have been applied for forecasting mortality. in 1992, a new method for long-run forecast of the level and age pattern of mortality was published by lee and carter. this method was welcomed by many authors so it was extended through a wider class of generalized, parametric and nonlinear model. this model represents one of the most influential recent d...
15 صفحه اولKey Technology of Predicting Dynamic Surface Subsidence Based on Knothe Time Function
A method for calculating the parameter of Knothe time function was presented. The principle of predicting dynamic mining subsidence was discussed based to the relationship between the periodic fractures of main roof and surface subsidence. Pointed out there might be a section whose width was shorter than a mining unit when divided a workface into n equal mining elements, the section should be c...
متن کاملDetermination of the height of destressed zone above the mined panel: An ANN model
The paper describes an artificial neural network (ANN) model to predict the height of destressed zone (HDZ) which is taken as equivalent to the combined height of caved and fractured zones above the mined panel in longwall mining. For this, the suitable datasets have been collected from the literatures and prepared for modeling. The data were used to construct a multilayer perceptron (MLP) netw...
متن کاملapplication of upfc based on svpwm for power quality improvement
در سالهای اخیر،اختلالات کیفیت توان مهمترین موضوع می باشد که محققان زیادی را برای پیدا کردن راه حلی برای حل آن علاقه مند ساخته است.امروزه کیفیت توان در سیستم قدرت برای مراکز صنعتی،تجاری وکاربردهای بیمارستانی مسئله مهمی می باشد.مشکل ولتاژمثل شرایط افت ولتاژواضافه جریان ناشی از اتصال کوتاه مدار یا وقوع خطا در سیستم بیشتر مورد توجه می باشد. برای مطالعه افت ولتاژ واضافه جریان،محققان زیادی کار کرده ...
15 صفحه اولذخیره در منابع من
با ذخیره ی این منبع در منابع من، دسترسی به آن را برای استفاده های بعدی آسان تر کنید
ژورنال
عنوان ژورنال: Energies
سال: 2022
ISSN: ['1996-1073']
DOI: https://doi.org/10.3390/en15145024